How to model slab-on-grade floor in simulation program
NC-2009 EAp2:Minimum Energy Performanceposted by lin wang on
As ASHREA90.1-2007 shown,the slab-on-grade floor of baseline building shoud be modeled by the parameter of F-factor.But the parameter to model slab-on-grade floor in program eQuest is U-value or pr
Baseline existing building envelopes
NC-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hi, We are currently working on an existing building under major renovation, pursing a LEED certification following NC protocol v.2009.
Energy modeling of a passive building - baseline case vs propose
NC-2009 EAp2:Minimum Energy Performanceposted by CONSTANZA CATTAN on
Dear all, I'm working on a passive building in which it was decided, as energy efficiency technique, to be buried.
FIre station modeling
NC-2009 EAp2:Minimum Energy Performanceposted by David Hahn on
I am currently working on a fire station building in NC and I'm using HAP 4.8 to model this building vs. the baseline.
Building occupied intermittently and use of Motion Sensors
NC-2009 EAp2:Minimum Energy Performanceposted by Brooks Critchfield on
We have a 3,000 SF building which will be occupied intermittently by the client/owner.
Senior Care/Assisted Living Facilities
NC-2009 EAp2:Minimum Energy Performanceposted by Carrie Webster on
Is anyone aware of exemptions or opportunities to take additional credit for senior care/assisted living facilities?
Zoning
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
“USER’S MANUAL TO ANSI/ASHRAE/IESNA STANDARD 90.1-2007” says: “An HVAC zone is physically determined by the design of the HVAC system.
Proposed Design HVAC Capacities
NC-2009 EAp2:Minimum Energy Performanceposted by AshLee Eustace on
Should heating and cooling capacities for the proposed design be modeled the same as the baseline (15% and 25% over-sized) or should they be modeled with actual capacities? Thank you
Evidence Required: sample lease(s) associated with LEED
NC-2009 EAp2:Minimum Energy Performanceposted by Jane Long on
Hi All, Could someone please enlighten me as to the relevant of the requirement to “provide the lease(s) or sample lease(s) associated with the LEED project” please? What leases?!