Forum quick links
Baseline system selection
NC-2009 EAp2:Minimum energy performanceposted by Jane Long on
I'm modelling a European Industrial project where nearly a 5th of the floor area is a specialist process area, similar to a clean room or laboratory, however used for industrial processes, in use 2
Modeling HVAC for future un-designed office space
NC-2009 EAp2:Minimum energy performanceposted by Vernon Smith on
I am modeling a 50,000 sf college cafeteria that has a basement, a main floor and a mezzanine. A portion of the basement is part of the cafeteria.
Regional industrial practices
NC-2009 EAp2:Minimum energy performanceposted by Valentin Grimaud on
Dear community, I am facing a problem meeting the eap2 credit since my project presents almost 80% energy cost related to process.
Old HVAC equipment transferred from other site
NC-2009 EAp2:Minimum energy performanceposted by Yastimy Jupson on
Hello, I have a new factory project recently. The owner wants to transferred old HVAC equipment from their old factory to this new factory.
Water heaters
NC-2009 EAp2:Minimum energy performanceposted by Paula Hernandez on
I have to model a building which is using solar pannels electric heaters.
Construction Assemblies
NC-2009 EAp2:Minimum energy performanceposted by Henrique Mendes on
We also were questioned regarding the construction assemblies used.
Manufacturing - prorate energy model
NC-2009 EAp2:Minimum energy performanceposted by Dave Hubka on
Hello Marcus, Projects pursuing CS certification are allowed to prorate the model based on owner control.
Do we have to include unconditioned spaces in the 3D model?
NC-2009 EAp2:Minimum energy performanceposted by Maya Karkour on
Dear All, I want to model a school project with 3 unconditioned basement floors hosting a car park. Do we really need to draw these spaces in the 3D model of the simulation, or can we just calcul
Modeling DOAS System efficiencies
NC-2009 EAp2:Minimum energy performanceposted by Brandon Frey on
I am modeling a geothermal heat pump system with a geothermal heat pump DOAS unit.
Baseline system types and building area
NC-2009 EAp2:Minimum energy performanceposted by Jatuwat Varodompun on
We have the project of to 250,000 sq ft. The Air conditioned area is only 50,000 sq.ft. The rest is enclosed unconditioned area (No HVAC) of 200,000 sq.ft.