COP CHILLER BASELINE

NC-2009 EAp2:Minimum Energy Performance
posted by  VICTOR MORENO  on 

Hi, I have to recalculate the chiller COP of Baseline Building, to consider the power of the fans? Or just put the COP marked by Standard 90.1 and attributed the fan power calculated by the Stan

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Mar 7, 2013, 1:44 pm

Large Process Loads from Data Center in Office building

NC-2009 EAp2:Minimum Energy Performance
posted by  Therese Malm  on 

We are working with a building where 60% of the annual energy use accounts for process energy due to a large data center.

4
Default Avatar
WSP Environmental
LEEDuser Basic Member
6 thumbs up
Tue Mar 5, 2013, 3:48 pm

process load

NC-2009 EAp2:Minimum Energy Performance
posted by  HOUCINE TLEMSANI  on 

We are having the same problem working on a building where 48% of the annual energy usage is process load from computers, screens and tv’s.

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 5, 2013, 2:33 pm

MPR for adjacent buildings

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

LEED project boundary lines that “slice” through party walls must not pass through any MEP service infrastructure.

7
Mon Mar 4, 2013, 4:43 pm

Part of HVAC considered as Process for clean rooms?

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, My project includes extraordinary energy consumption for HVAC resulting from maintaining clean room environments – specifically the amount of air changes and pressure requirements

3
Thermal Engineer
TERAO Green Building Engineering
LEEDuser Basic Member
28 thumbs up
Fri Mar 1, 2013, 7:18 pm

Campus Energy System

NC-2009 EAp2:Minimum Energy Performance
posted by  Therese Malm  on 

Hi, We are working with a building in Norway that has a ground-source heat pump as its main heating system and it is also connected to communal district heating as a back-up.

10
Default Avatar
WSP Environmental
LEEDuser Basic Member
6 thumbs up
Thu Feb 28, 2013, 3:38 pm

Exterior lighting on building roof surface

NC-2009 EAp2:Minimum Energy Performance
posted by  Wei Jiang  on 

I'm working on a project with sitting areas and outdoor swimming pool on a building flat roof surface and installed with exterior lighting.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Feb 25, 2013, 5:59 pm

Insufficient Cooling Capacity

NC-2009 EAp2:Minimum Energy Performance
posted by  Yoyo Shek  on 

Dear All, According to 90.1, the HVAC system shall follow the design for proposed case. I wonder what if the HVAC engineer under-sizes the cooling capacity.

4
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Fri Feb 22, 2013, 4:44 am

Health care - Process Loads

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I'm working on a specific project which consists of a health/diagnostic centre which uses machines such as X-rays, magnetic resonance and other medical equipment which were modeled as process

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Feb 16, 2013, 8:21 pm

HVAC System selection

NC-2009 EAp2:Minimum Energy Performance
posted by  Ciaran McCabe  on 

Hi does anybody have any feedback on how different systems perform in term of the energy credits for LEED NC.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Fri Feb 15, 2013, 7:08 pm