Predominant spaces determined by square footage or hours of use?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I have a roughly 48,000 sf church with the following breakdown by area and hours of use: 1st Floor: 4,100 sf Multipurpose Space used 16 hours per week 8,200 sf Common Space used 72 hours per week
Lighting for Dormitories
NC-2009 EAp2:Minimum Energy Performanceposted by Ryan McEvoy on
LEED Interpretations state that hard-wired lighting in residential units must be modeled identically in the baseline and proposed cases. Does this apply to college dormitories as well?
Interactive 90.1-2007 Compliance Form - ENVELOPE
NC-2009 EAp2:Minimum Energy Performanceposted by Sangmin An on
Hello, I am Sangmin of SGS Korea. I have a few question regarding Interactive 90.1-2007 Compliance Forms - building envelope compliance documentation (mandatory provisions checklist). 1.
Derated Insulation
NC-2009 EAp2:Minimum Energy Performanceposted by Todd Bundren on
I had a response from an energy model reviewer indicating my r-value calculations are not acceptable because we failed to derate the 3.5" R-11 batt insulation per Table A9.28B of ASHREA 90.1-2007.
Exterior Lighting - Multiple Buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi, How is possible to consider Exterior Lighting Energy Consumption on a Multiple Building Process where there is no specific boundary per each building?
ASHRAE Manditory Requirements Insulation
NC-2009 EAp2:Minimum Energy Performanceposted by John Covello on
Hello, Is there a guide or list somewhere as to what materials are acceptable to use for insulation? We want to know what options we can use. Thanks. John
Average energy cost savings
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Does anybody know what is the average of energy cost savings reported to LEED/USGBC? We are just wondering to compare all projects overall. Thanks
Type and Number of Boilers
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In the building that I’m modelling there are two floors. On the ground floor the conditioned area is 3393m^2 and on the first floor it is 2689m^2.
Effective Daylit Zones
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, I want to model daylighting sensors for an open plan office.
Refrigerations system
NC-2009 EAp2:Minimum Energy Performanceposted by Matteo Rigo on
Do the refrigeration system such as walk-in coolers or refrigeration cases must be detailed modeled in the simulation program (E+)? or is it possible consider them as a process loads?