Forum quick links
Residential Default Fixture Uses
NC-2009 WEp1:Water use reductionposted by Tomas Kurka on
Hi, I am working on LEED certification of hotel project.
ablution fixture
NC-2009 WEp1:Water use reductionposted by Erin Holdenried on
I assume an ablution fixture used to wash before entering a prayer room would have to be considered in the water use calculations. What would the baseline rate of the fixture be?
Credit Compliance with Un-determined Future Fit-out Space
NC-2009 WEp1:Water use reductionposted by Catherine Blakemore on
My project only has scrubs sink, which are exempt from LEED water use reduction requirements. The other portion of my project is undetermined, future fit-out space.
Healthcare Prereq 1 Fixtures and Calcs
NC-2009 WEp1:Water use reductionposted by Derek Sylvia on
This is my first time doing the LEED paperwork. I'm not sure I'm using all the correct fixtures while filling out prereq 1. Currenly I only have water closets and lavs filled out.
Rainwater use applicable for non-Retail/Healthcare projects?
NC-2009 WEp1:Water use reductionposted by Timothy Casper on
The USGBC document, "Water Use Reduction Additional Guidance" states, "Retail and Healthcare projects may apply on-site non-potable water sources for fixtures and process water use reduction." Doe
Limit of water flow?
NC-2009 WEp1:Water use reductionposted by Henrique Mendes on
Hello everyone! We are having problems with the WEp1 water use reduction.
Hotel Spa Water Use - LEED NC
NC-2009 WEp1:Water use reductionposted by Ian McCall on
I am working on a high-end hotel that has a spa installed. Is the spa considered in the water use reduction calculations or is it considered process as water? Thank-you
Wash Fountains not meeting .5 gpm baseline.
NC-2009 WEp1:Water use reductionposted by Greg Kight on
Unless USGBC has a different interpretation with regards to wash fountains , we may not be able to get points on water conservation because the wash fountains (Bldg 3) uses 3 gpm.
I have restrooms in the
NC-2009 WEp1:Water use reductionposted by Marcio Alberto Casado Pereira on
I have restrooms in the building I am certifying, an also restrooms with showers in a 40sqm building inside my project boundary.
Template rounding for Design Case-Urinal
NC-2009 WEp1:Water use reductionposted by Rebekah Burke on
We have completed our template with all fixtures included and are at 39.97% savings!!! UGH.