Post a question or comment
Credit Filters
Light Pollution Reduction
Filter by location
Forum
Topic
Replies
Recent

Zero lot line with lighting on the facade

NC-2009 SSc8:Light Pollution Reduction
posted by  Mathilda Jonsson  on 

Hi all! Our project is a zero lot project adjacent to a public walkway.The municipality will not provide any street lighting for the public walkway.

0

Property boundary at center of roadway

NC-2009 SSc8:Light Pollution Reduction
posted by  Anders Olson  on 

The property line for a LEED NC Retail project I am working on extends to the center of the abutting roadway.

0

Sports Field Lighting (floodlighting) power densities

NC-2009 SSc8:Light Pollution Reduction
posted by  Ameet AA  on 

I am working on Football Club Academy project based on LEED NC 2009 and AGMBC 2011.

0

LEED SS 8 credit language...

NC-2009 SSc8:Light Pollution Reduction
posted by  Rick Alfandre  on 

Regarding the interior light requirements: We have an office building that is not intended to be in use during the 11pm to 5am period, therefore we will have automated controls w/ manual overide an

0

Hotel guest rooms = dwelling units

NC-2009 SSc8:Light Pollution Reduction
posted by  Jens Apel  on 

I understand that residential units are exempt from interior lighting requirements. Does this include hotel guest rooms as well?

0

SS Credit 8 Lighting Pollution Reduction Non-Tradable Surfaces

NC-2009 SSc8:Light Pollution Reduction
posted by  Allan Francis Manlapig  on 

Hi, I have problem using the form for SS Cr 8. I don't have any Nontradable surfaces in my project so I just leave the LPD portion for exterior nontradable portion blank.But when I do check compli

0

Flagpole Restrictions

NC-2009 SSc8:Light Pollution Reduction
posted by  Shad Traylor  on 

Are flagpoles exempt from this criteria. I did a word serach of the entire LEED Reference Guide and it does not address this condition.

0

Facade lighting / Advertising

NC-2009 SSc8:Light Pollution Reduction
posted by  CT G  on 

A project we are working on is considering including facade lighting with LEDs.

0

Sample LPD Calculation Error?

NC-2009 SSc8:Light Pollution Reduction
posted by  Nathan Witte  on 

I believe there is an error in the Sample LPD Calculation file that has been provided. Or, my understanding how to correctly calculate the LPD is wrong.

0

Shared Project Boundaries

NC-2009 SSc8:Light Pollution Reduction
posted by  Ezra Gutschow  on 

LEED CR SSc8 We are working on a USAF aircraft hangar project where two hangars that are being designed side by side. The LEED boundary between the two projects runs along a paved driveway between

0