Planned Transfer Center
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Josh Mauldin on
My project is a fire station that is the first project on the site of a mixed use development. A bus transfer center is planned to be built directly across from the fire station.
EP - rail AND bus vs. rail OR bus
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by John Edwards on
The EP Option 2 criteria for SSc4.1 requires 2 rail stations within 1/2-mile OR 2 bus stops serving 4 lines within 1/4-mile, with a minimum of 200 rides per day.
Definition of Main Building Entrance
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Annalise Reichert on
I am working on a project that has a main lobby entrance and another side entrance.
Proximity to rail station
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Sheryl Swartzle on
Our one and only bus, which stops right outside our project entrance, is a 10 minute drive in heavy traffic (meaning many rides would be less than 10 minutes) but 3.5 miles to a Metro Rail station.
Existing bus stop
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by lance mccardle on
We are doing a major renovation on a multifamily housing complex that was built in 1990 with bike racks and a bus stop that the owners put in when the building was first constructed.
Project is in itself a public transportation system
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Valentin Grimaud on
Hi, The project I'm currently looking at is a subway line, with the possible certification of each station independently. Could we consider that each station fills the requirements for this projec
Using BD+C SSc4.1 as an EBOM IO credit
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Michael Smithing on
We're working on the EBOM certification of a building with excellent public transportation. Has anyone attempted to use SSc4.1 as an IO credit in EBOM?
LEED Pilot Credit 30
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by S. Sachs on
We are pursuing v2009 certification on an office building for this credit using Pilot Credit 30 for bicycle routes (alternative compliance path); however, since this project started the pilot credi
Bus Line Rerouting for Adjacent Bridge Construction
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Kevin McNulty on
Hi. My firm is working on a building that will be located right at the foot of a large bridge project that is currently in construction (estimated reopening in a few years).