NC-2009 SSp1:Construction Activity Pollution Preventionposted by Paula Hernandez on
Our project has a very small semi-permanent stream runing through it (i.e., the streams forms only in heavy rainfalls). .
Perimeter Controls
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Mesquita on
Good day I want to consult in relation to a project in a lot of 10 hectares (about 25 acres) with a perimeter of 1377 m (about 4500 ft).
LEED Boundary / Silt Fencing
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Carrie Laurendine on
Currently working on a project that is a large site with an existing building currently on the site.
Checking ESC plan at design stage?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Hrvoje Kvasnicka on
Hi All Since this is a prerequisite which forms part of construction stage submittal, I was wondering if it there is a way to have the ESC plan reviewed by GBCI at design stage.
Zero lot line existing building renovation
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Kim Shinn on
This project is a re-skin, and interior re-fit. Complete preservation of the structure. There was no site soil distrubance. What is required for SSp1 documentation?
Sediment Basin
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Paula Hernandez on
Hello again, we are working on a project for which we are installing a sediment basin. According to EPA we could use the calculation of 3600 ft3 / acre drained to size it.
In which construction phase can I certify my building?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Hazem Yusuf on
Construction phase of an office building is consisting of multi stages.
Concrete Washout
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Paula Hernandez on
Hello everyone, we are working on a project in an estate, part of this estate is the current LEED project, with its own LEED boundary.
Dust control
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Lawrence Lile on
What are the common measures used for dust control? SWPP plans I see around here always deal with soil erosion, but dust control is commonly ignored by inspectors and on most construction sites.
Site Boundary, SWPPP and Erosion Control
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Sandra Ehle on
My firm has built an Athletic Field house for a local school district. SWPPP and ESC plans were created and followed accordingly. Now here is where it gets complicated.