Forum quick links
Alternative for ESC plan in hot climate zones (Outside the US)
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Eyad Haj Husein on
We're applying for LEED for New Construction in Doha, Qatar. The question is: where can I find information about the alternative of ESC plan?
Compressed Natural Gas Excavation Equipment
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Janna Nash on
Can anyone tell me if there is a LEED NC credit that would "reward" a project for using Compressed Natural Gas in excavation and other construction equipment?
date stamped photos
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Mike Decoster on
LEED online requests the following: Provide date-stamped photos showing the measures taken, including any corrective action, to effectively implement the ESC plan.
Topsoil
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Ameet AA on
Could anyone please advise, whether the project would fail to achieve the SSp1: Construction Activity Pollution Prevention, if approx.
Is the SWPPP required?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Maya Karkour on
Dear All, I am working on a project outside the US, where there are no local standards regarding ESC measures (the local codes are rather too general and do not address the requirements of this p
Hurricane/Tropical Storm Damage
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Megan Bove on
As most are fully aware, the east coast was severely hit by Tropical Storm Sandy. I am currently working on a LEED job that was completely flooded and damage was done.
Contractor documentation of compliance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Nathaniel Parrott on
Construction of our project has been completed and ESC plan was followed. We have the superintendant's log reports for all the days silt fence was checked or fixed.
Licensed Professional Exemption
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Elliot Powers, LEED AP BD+C on
The LEED-Online submittal form states that a LPE is available to Registered Civil Engineers in lieu of providing an ESC plan and construction drawings.
Level of detail needed in ESC?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Patty Breech on
This is vaguely referenced in other posts, but I'm still confused: what is the level of detail we need to submit for our written Erosion & Sedimentation Control (ESC) plan?
A client with ongoing site works asks about LEED feasibility
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Mauricio Ramirez on
The owner of a project is considering the possibility of the project to become LEED Certified.