NC-2009 PIf2:Project Summary Detailsposted by Mary Kay on
My project is new construction - a hangar at an airport that will be used for painting jet airplanes. The owner already has previously built a building adjacent to our site with a parking lot.
Hardscape
NC-2009 PIf2:Project Summary Detailsposted by Chris DeVolder on
Hi all, Thanks for the comments/feedback above. We have a small playing field/recreation field within our boundary adjacent to our building.
Crawl space included in GSF? Interior courtyards?
NC-2009 PIf2:Project Summary Detailsposted by Michael Wironen on
We have a fairly complicated building project that includes two areas that are unclear to me as to whether they should be included in the gross floor area calculation: 1.
10% exclusion of square footage "defined" for EBOM credits
NC-2009 PIf2:Project Summary Detailsposted by Wendy Parker, LEED AP on
Does the 10% excluded square footage for one credit (allowed in EBOM 2009) have to be the same excluded square footage used in another credit?
Gross Square Footage
NC-2009 PIf2:Project Summary Detailsposted by Indochine Engineering VN on
Hi! My project is using double glazing facade, there is inner glass at the floor, then big air gap and the outer glass that is hang by a steel structure.
Floor Area Ratio Calculation
NC-2009 PIf2:Project Summary Detailsposted by James Wieben on
The property my project is being built upon is 25,920 SF and my LEED Project Boundry contains 31,348 SF.
PIf2
NC-2009 PIf2:Project Summary Detailsposted by shaun Andriano on
This might be an easy one... Our PI form 2 was recently not approved following final design review.
Total Site Area Within the LEED Project Boundry
NC-2009 PIf2:Project Summary Detailsposted by James Wieben on
I have a project with a Lot area of 25,000 SF and a LEED Project Area of 31,000 SF due to sidewalk and landscape scope of work in the ROW.
Plf's for a Master Site
NC-2009 PIf2:Project Summary Detailsposted by Donald Green on
A Master Site only needs to fill out Plf1 under the New LEED Platform as only that Plf shows up as possible in the scorecard. As LEED Online v3 does not have this capability, does a Master Site ha
PIf2- Project Summary Details
NC-2009 PIf2:Project Summary Detailsposted by Karly Michalowski on
What to do if project owner will not supply project budget?