General factors considered when selecting technologies.

NC-2009 PIf2:Project Summary Details
posted by  Jun MA  on 

Can anybody share the common factors considered when selecting technologies for credits? (E.g. Easy installation, Low-Cost, Multiple credit achievements, etc. )

1
Sat Feb 2, 2013, 3:37 pm

Pedestrian Walkway

NC-2009 PIf2:Project Summary Details
posted by  Ashley Sadowski  on 

Hello, We are adding a pedestrian crosswalk to connect the building to the opposite side of the street. This was not required and are hoping to achieve an ID point for including it.

1
Tue Jul 2, 2013, 8:25 pm

Underground floors...

NC-2009 PIf2:Project Summary Details
posted by  Marcin Gawronski  on 

We are currently assessing office building which has 2 underground floors. On level -2 there are only: parking, storage, mechanical rooms etc.

1
Sun Jan 12, 2014, 11:56 pm

Gross Project Square Footage

NC-2009 PIf2:Project Summary Details
posted by  Catherine Blakemore  on 

When we registered one of our healthcare projects we entered it with a gross project square footage of 14,300. Under the LEED project, the 2nd floor will just a floor and shell, with no finishes o

1
Wed Mar 13, 2013, 12:46 am

Rating System?

NC-2009 PIf2:Project Summary Details
posted by  Racha Rachwan  on 

I'm working on a project containing one Basement, Ground and a first floor, it is a residential building, its building footprint meets the minimum program requirement.

1
Mon Apr 7, 2014, 3:05 pm

Mechanical Boundary Differs from Overall Project Boundary

NC-2009 PIf2:Project Summary Details
posted by  John Havenstrite  on 

I am working on a project where the architectural work includes "facelift" work with no HVAC upgrades in roughly half of the scope.

1
Thu Feb 19, 2015, 9:10 pm

Dormitory as support building

NC-2009 PIf2:Project Summary Details
posted by  ABDUL MUTHALIB MOHAMED  on 

We would like to register a factory building in Bangladesh. Th built up area of factory building is 2 lakh SFT, Ground level only.

1
Fri Apr 29, 2016, 12:24 pm

"total gross square footage / gross floor area"

NC-2009 PIf2:Project Summary Details
posted by  Carrie Laurendine  on 

LEED-NC PIf2 - second row prompts user to fill out "total gross square footage / gross floor area" im confused what they are asking for. and also not sure where to look to research this.

1
Sat Jan 12, 2013, 3:27 pm

Spoil Area

NC-2009 PIf2:Project Summary Details
posted by  Ashley Sadowski  on 

I am working on a large dormitory project which requires a "spoil area" on an adjacent lot which accommodates the excess soil in the cut/fill process of regrading the site.

1
Tue May 14, 2013, 9:50 pm

Total number of parking spaces

NC-2009 PIf2:Project Summary Details
posted by  Erin Nuckols  on 

Hello, I am working on a museum project with an existing building that is not a part of the scope.

1
Sun Sep 29, 2013, 4:41 pm