v4.1 Renewable energy with v4.0 EAc2 Energy Performance

NC-v4.1 EAc5:Renewable Energy
posted by  Chris Flint Chatto  on 

Just want to make sure its OK to use the v4.1 version of renewable energy credit with a v4.0 project that is using the v4.0 version  of EAc2 Energy Performance. 

6
Default Avatar
Green Building Specialist
LS3P Associates Ltd.
LEEDuser Premium Member
0 thumbs up
Fri Aug 8, 2025, 2:24 pm
9
Green Mystic in Residence
LEEDuser Basic Member
75 thumbs up
Wed May 14, 2025, 8:07 pm

Green Power Purchased from Utility

NC-v4.1 EAc5:Renewable Energy
posted by  Jennifer Wehling  on 

We are working on a new building on a college campus for which the District purchases green power annually from the utility as part of a 20-year contract (with 13 years remaining).

1
Fri Mar 28, 2025, 2:31 pm

Ownership of Attributes: On-Site PV with Utility Program

NC-v4.1 EAc5:Renewable Energy
posted by  Summer Minchew  on 

The LEEDonline form for this credit requires us to, "Upload On-site Renewable Energy Systems...Contract and evidence of renewable attribute ownership.

3
Vice President
Moseley Architects
LEEDuser Premium Member
10 thumbs up
Mon Jan 27, 2025, 10:15 pm
3
Default Avatar
Project Manager
LEEDuser Basic Member
14 thumbs up
Thu Aug 8, 2024, 12:48 pm

Renewable Energy Calculator

NC-v4.1 EAc5:Renewable Energy
posted by  Mike Halcom  on 

We are contemplating changeing form LEED v4 to LEED v4.1 for renewable energy with a 100% owned PV system on-site.  Has anyone found the LEED Renewable Energy Calculator that is required to be

16
Project Manager, Architect
PGAL
LEEDuser Basic Member
0 thumbs up
Thu Jul 18, 2024, 1:16 pm

LEED 4.1 Tier 2 & 3 Renewable Energy and District or Campus Thermal Energy (DES)

NC-v4.1 EAc5:Renewable Energy
posted by  Hans Marsman  on 

We are working on a building connected to a campus central plant (DES).

2
Mon Apr 8, 2024, 1:21 pm

Chinese Green Electricity Certificate "GECs"

NC-v4.1 EAc5:Renewable Energy
posted by  Josef Andersen  on 

Hi!

 

It came to my knowledge that USGBC does not accept Chinese Green Electricity Certificate "GECs". 

1
Tue Jan 2, 2024, 7:55 pm

v4.1 July 2023 Guide - EAC Arbitrage

NC-v4.1 EAc5:Renewable Energy
posted by  Christina Hohman  on 

The newest v4.1 Guide (July 2023) has added the following language - "Note that while the previous versions of LEED allowed for EAC arbitrage for on-site systems, LEED v4.1 requires the owner to re

1
Fri Sep 22, 2023, 3:28 pm

Offsite renewable energy production

NC-v4.1 EAc5:Renewable Energy
posted by  Subhashkumar A  on 
The project is planning to achieve renewable energy credits through offsite solar and wind power generation.
1
Tue Sep 19, 2023, 5:24 pm