Forum quick links
All campus occupants will use showerheads inside our building
NC-v4 WEp2:Indoor water use reductionposted by Paola Moschini on
Our building is on a campus (industrial facility where all workers need to make a shower at the end of the worktime) and our building provides restroom facilities with showerheads for all other bui
AHSRAE 90.1, G3 Modeling Question - External Louvers/Shades
NC-v4 EAp2:Minimum energy performanceposted by Brian Salazar on
Hello! Our team is researching opportunities to reduce SHG loads on an 8-story new construction university residence hall.
Hospitality Project- Non-US .
Hospitality-EBOM-v4 EQc7:Green cleaning - products and materialsposted by Mitra Azimi on
We have a hospitality project pursuing LEED v4 O+M, which is located in European Union. To provide documentation for this credit, we have challenges.
Which parking spaces should be counted?
CI-v4 LTc5:Reduced parking footprintposted by Mike D on
The credit requires to achieve a % reduction from base ratios. If the CI project only forms a part of a tall office building, which number of parking spaces should be taken into consideration?
HPD with GHS SDS
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Vandita Mudgal on
Question about HPDs with Content Inventory marked as GHS SDS.
SMOKING SIGNAGE for EAp: Environmental Tobacco Smoke Control
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Ramon Christopher Medrano on
With regards to our LEED v4 O+M project (group approach).
Hybrid recooler
NC-v4 WEc3:Cooling tower water useposted by Florian Schmidtchen on
Dear all, Our MEP Engineer wants to implement a dual recooling system/the hybrid recooler of the series KAVH.
CO2 Monitor without Densely Occupied Spaces
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Jesse Hunt on
Does anyone know if you can achieve a point for CO2 monitors without any densely occupied spaces?
Indoor Water Use Reduction - Occupancy clarification
NC-v4 WEp2:Indoor water use reductionposted by Subhashkumar A on
The project building is a gym building (G+2). On the second floor, it has residential units for its employees. The employees who work in this gym building stay in these residential units.
In what case we don't have to run a baseline model with all 4 rotation
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi , I am working on a LEED Data center model with majority of space as vault, now I know for an existing building we dont need to rotate but for a data center do we need to rotate as the majority