Energy Modeling

NC-v4 EAp2:Minimum energy performance
posted by  Muzamil Rafique  on 

Dear All, i am doing a energy simulation for bank building. software have no option LEED Rating V4. It have only LEED 2009 rating system.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jun 23, 2016, 4:07 pm

Advance notice of not less than 72 hours before pesticide use

EBOM-v4 EQc9:Integrated pest management
posted by  Noriko Nagazumi  on 

Hello. Did the requirement of an advanced notice of not less than 72 hours before a pesticide under normal conditions got erased from EBOM v4?

2
Corporate Regional Quality Assurance Manager / IPM Consultant
Clark Pest Control
LEEDuser Basic Member
1 thumbs up
Tue Jun 21, 2016, 9:23 pm

What if the Database of LCA tools is incomplete ?

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Marius Dabonneville  on 

Hello, I’m Marius, I’m an intern in an environmental office in France. I’m working on Materials and that’s why I have a few questions about this credit and particularly Option 4.

4
Sun Jun 19, 2016, 6:44 pm

Looking for a source for no voc plywood floor sheathing

Mid-Rise-v4 EQc7:Low-emitting products
posted by  Phil Vanderloo  on 

Can anyone direct me to a source for compliant 1 1/8" T&G plywood floor sheathing. Also hoping to find compliant mdf base and door casings. Thank You

3
President
Hiline Builders Inc.
LEEDuser Basic Member
5 thumbs up
Wed Jun 15, 2016, 3:55 pm

Compliance of an EPD

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Charline SEYTIER  on 

Dear all, We have a Type III environmental declaration form for a product, verified by a third party (Bauen und Umwelt institute).

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Fri Jun 10, 2016, 10:48 am

Operational Energy

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Charalampos Giannikopoulos  on 

When conducting a LCA will the baseline and proposed building have the baseline and proposed energy usage accordingly (as per Minimum Energy Performance calculations) or will both have the same ene

9
Fri Jun 10, 2016, 10:40 am

Is IESVE IMPACT an accepted LCA tool?

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Juliana Moreira  on 

Hi, in the UK we are using a LCA tool called IESVE IMPACT.

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Fri Jun 10, 2016, 10:05 am

Athletic Field Definition

NC-v4 WEc1:Outdoor water use reduction
posted by  Michelle DiPenti  on 

Our project has an outdoor area, as a part of the sports medicine department, which patients will use to do sprints, drills, and other exercises.

3
SW Regional Design Resilience Leader
Gensler
LEEDuser Basic Member
15 thumbs up
Thu Jun 2, 2016, 1:50 pm

Leed v4- NC of Logistic Center.

NC-v4 EAp2:Minimum energy performance
posted by  Helena Garcia   on 

It is making energy simulation for a logistic center for storage. Local regulations based on European regulations not required to be heated, instead ASHRAE required to be heated. How should we co

7
Tue May 31, 2016, 5:08 pm

Project Boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sharon Dearstyne  on 

We have a 11 story Historical hotel with 6 floors of Guest Rooms that are being completely renovated. The remaining floors are Ballrooms, meeting spaces and retail.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu May 26, 2016, 6:30 pm