Forum quick links
LEED AP - Homes or BD&C?
Homes-v4 INc2:LEED AP for Homesposted by David Ekstrom on
Basic credit languages says "LEED AP with a specialty appropriate to the project," which would logically be LEED AP-Homes.
Baseline model for storage facility
Warehouses-NC-v4 EAc2:Optimize energy performanceposted by Jeremiah Crossett on
Hi, I am working on a 5 story self storage building in Shoreline WA as the modeler.
ATES in combination with HP
NC-v4 EAc5:Renewable energy productionposted by Ydo Schuuring on
We would like achieve points for the credit: Renewable Energy Production. The design team is considering an Aquifer Therma Energy Storage (ATES) in combination with a heatpump.
Credits in addition to Optimize Energy Performance?
NC-v4 EAc5:Renewable energy productionposted by Dianne Herrin on
Hi - Our solar system is adding two points to our "optimize energy performance" category due to the cost offset.
Shuttle Services
NC-v4 LTc5:Access to quality transitposted by sriram tetali on
Dear All can any one suggest whether we can claim the Shuttle services provided by client in the LTc4 or LTc5 credits in LEED v4 NC Rating system Thanks & Regards sriram
Modeling Office Space in an Existing High Rise Building
CI-v4 EAp2:Minimum energy performanceposted by Annie Argento on
We're using eQuest to model a tenant improvement office space, which is about half of one story in a 28 story high rise office building in LA.
Help with LEED ND
ND-Plan-v4 MPR1:Must be in a permanent location on existing landposted by T J on
I'm a beginner and not familiar with the certification process and actual documentation. Where can I get samples or ideas on how to to begin making a simple LEED-ND assessment report including chec
Laboratory
NC-v4 WEp2:Indoor water use reductionposted by Vanessa Montezuma Ramos on
My project is an Investigation Center which has laboratories. The lavatories found in the lab area (chemistry) should be considered in this credit?
Entry way systems
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Kerry Honsinger on
I read recently in a thread that someone was claiming Entry Vestibules are required. Nowhere in the reference guide am I reading this.
Previously developed
ND-v4 SLLc1:Preferred locationsposted by Sarah Kearney on
Hello, We are developing 50-acre of mixed-use development. Currently mainly all the land is parking lots and has been so for over 20 years.