Forum quick links
On site + Off-site restoration
ND-Plan-v4 SLLc8:Restoration of habitat or wetlands and water bodiesposted by Guillaume Martel on
Our project is redevelopping a contaminated site (whole city block), which is part of a larger urban area belonging to the same owner.
CO2 sensors - "thermal zone"
CS-v4 EQp1:Minimum indoor air quality performanceposted by Jens Apel on
For naturally ventilated spaces in one of my projects it seems that CO2 monitors are the only option applicable. I've got some questions regarding this: 1.
Tri-gen
NC-v4 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, I am QA'ing a model for a building that will be fed via a cogeneration plant (with absorption chillers) and therefore is a little complicated.
Campus Project Guidance
Schools-NC-v4 LTc6:Bicycle facilitiesposted by Philippa Cameron on
Hi. We have a Campus school project with 4 buildings to be certified under v4, two of which are to be BD+C for Schools and the other BD+C NC.
Renewable Energy Cost Saving for LEEDv4
NC-v4 EAc2:Optimize energy performanceposted by Daniel Ohnuma on
The LEED v4 Guide steps that it's possible only apply any savings from ON-SITE renewable energy systems?
Feedback on test results?
CI-v4 EQc4:Indoor air quality assessmentposted by Joanna Switzer on
Hey all, I've heard informally from one lab that they are seeing a number of v4 projects fail their IAQ tests - appears the newly introduced glycol level thresholds are a common obstacle.
Transportation Planning Handbook
NC-v4 LTc7:Reduced parking footprintposted by Susannah Goddard on
I don't have a copy of this to hand but need to know the content of Tables 18-2 to 18-4.
Natural ventilation openings' control
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
According to ASHRAE 62.1 - 2010 User's Manual, example 6-AF, the requirement associated with controls that guarantee that the openeings remain open during occupancy can be met with an administrativ
FAR for parks with pavillion
NC-v4 SSc3:Open spaceposted by nancy picard on
I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?
Question about ASE study area
NC-v4 EQc7:Daylightposted by Jackie Cheung on
Hello everyone. May I ask 2 questions about this credit? A) Assuming a project go for option 1.