Forum quick links
historic district
NC-v4 LTc3:High priority siteposted by sepideh khodadadi on
can anyone explain historic district? i don't exactly know what that is
walkable Street - Item C - MU / NR distance to sidewalks
ND-Plan-v4 NPDc1:Walkable streetsposted by Ian Scott on
This credit item indicates that it is building facades must be within "within 1 foot (300 millimeters) of a sidewalk or equivalent walking route." But then in Step by Step guidance it indicates - "
Is green space above underground parking previous or impervious?
NC-v4 SSc4:Rainwater managementposted by Valentin Grimaud on
Dear all, We are currently wondering what is th ruling in the case of an underground parking being below a green space area, which we would tend to account for in the pervious area contribution fo
Demolished and rebuilt envelope
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
If the envelope is demolished and then rebuilt with the same shape does Table G3.1 part 5., baseline, point f apply?
Uplight - homemade U0 luminaire
NC-v4 SSc6:Light pollution reductionposted by Gustavo De las Heras Izquierdo on
Hallo Bill, The Reference Guide mentions "Software is also available that will calculate the BUG rating using the IES file for the luminaire." Would you please share with us what software the guid
Modified rational method - rainfall intensity
NC-v4 SSc4:Rainwater managementposted by Hana Raitrova on
Dear All, I´m still wondering how to get a value of rainfall intesity in inches/hour or mm/hour for the 95th percentile (option 2 - modified rathional method) based on time concentration.
Vertically Attached Project
CS-v4 EAc2:Optimize energy performanceposted by LEED Pro Consultant on
Our team is working on a project which follows a vertically attached approach.
Paired bus route service
NC-v4 LTc5:Access to quality transitposted by Patrice McVeigh on
Hi, Is it necessary for both stops to be within 400m of the site in order to satisfy the paired route requirements?
consumption and demand
NC-v4 EAc3:Advanced energy meteringposted by Francesco Passerini on
Does "Electricity meters must record both consumption and demand" mean that both kWh and instantaneous kW must be recorded?
acrylic with non paper backer
Homes-v4 MRp2:Durability managementposted by Elizabeth Eason on
The credit calls for non paper faced backer board behind fiberglass enclosures. Does that apply to behind acrylic surrounds also?