Forum quick links
EPDs and Manufacturing Dates
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Michelle Rosenberger on
Does an EPD need to be issued before the manufacturing date of the product installed? Or do we just need to provide an EPD for that product when we submit for certification?
CI in a CS project
CI-v4 LTc2:Surrounding density and diverse usesposted by Sara Johansson on
If a tenant chooses to certify ith CI in an already CS v.4 certified building (that has earned full points for Surrounding Density and DIverse Uses as well as Access to Quality Transit, Bicycle Fac
What is the baseline assumption for this credit?
CI-v4 IPc1:Integrative processposted by Betty Liu on
Hi All, We are designing a CI v4 office space in an existing high-rise building.
CO2 monitoring densely occupied spaces, exemption rooms <150 sf
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Maria Porter on
Why are not small rooms (less than 150 sf) exempt from the CO2 monitoring requirements? In EB:OM and several other places and standards they are.
Combined Purchasing
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by Ryan Hoffman on
The project in question is the north building of a 2-building, 1 million sf facility.
Calculations for an Elementary School
Schools-NC-v4 LTc7:Reduced parking footprintposted by Cynthia Kaplan on
We are trying to figure out how to translate our ITE calcs properly for an elementary school project.
No cooling tower
NC-v4 WEc3:Cooling tower water useposted by Maria Porter on
If you have no cooling tower, do you automatically get the point or you are not eligible for the credit?
About Existing Building for Retail
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Esteban Martinez on
Hello, we are working on a existing building retail project, which has 43720.42ft2 and 31.16ft height with CO2 concentrations between 500 and 600 ppm.
manage (rainwater) on site
NC-v4 SSc4:Rainwater managementposted by Manuel Martin Delgado on
Hi, Is reusing rainwater for flushing toilets an accepted solution for achieving this credit? Or is reusing for irrigation the only solution accepted? Thanks.
Demand Response on Campus applied to CI (2009) project?
NC-v4 EAc4:Demand responseposted by Margaret Montgomery on
We're doing a project that is >75% of the interior of the building (nearly all of it), but is considered CI.