Forum quick links
Double- Counting of Renewable Energy
CI-v4 EAc4:Renewable energy productionposted by Bharath Ravuru on
Hi, We are going with solar panels on site at our facility. Can I use the renewable energy generated for both on-site renewable energy production credit and also energy savings in the simulation?
University Campus Transit
NC-v4 LTc5:Access to quality transitposted by Rebecca Brown on
It seems from the credit language that bus stops do not need to be publicly accessible in order to comply with the credit. Would a university campus shuttle service count for this credit?
Vulnerable Populations
NC-v4 SSc1: Site assessmentposted by Saxon Gibbs on
How does LEED define vulnerable populations and what is the best way to assess proximity to them?
Site-wide measures
CS-v4 SSc4:Rainwater managementposted by Mike D on
If there are rainwater management measures taking place as part of the masterplan surrounding and including the project building but these are not within the LEED project boundary, can those measur
Looking for the best home energy metering system
Homes-v4 EAp2:Energy meteringposted by Phil Vanderloo on
In my research, I seem to be hearing the most about Site Sage by Powerwise as the best available energy metering system out there.
Sound Transmission - achievable?
NC-v4 EQc9:Acoustic performanceposted by Tim Habraken on
For a project, we are dealing with the following situtation: we have small meeting rooms, situated (as "boxes") in an open-office plan.
LEED v4 Reference Guide and EA credits
NC-v4 EAc4:Demand responseposted by Ivan Romero on
The Quick Reference table on page 22 of the LEED v4 Reference Guide indicates "n/a" in all columns except Healthcare for the EA credits Demand Response, Renewable Energy, Enhanced Refrigerant Manag
Alternative Compliance Path - C&S LEED Threshold reduction
CS-v4 EAp2:Minimum energy performanceposted by MKK LEED on
Can LEED V.4 C&S projects use the same Alternative Compliance Path (ACP) provisioned for LEED V.3 C&S projects as outlined in the link below?
Infill Site
ND-Plan-v4 SLLp1:Smart locationposted by Jos Schild on
Is there a definition of an 'infill site'?
Visitors for residential units
NC-v4 LTc6:Bicycle facilitiesposted by Sara Johansson on
Hello, Where can I find info on regular and peak visitors for residentual units? App 2 does not give any information on residentual units.