Borrowed Daylight

NC-v4 EQc7:Daylight
posted by  Razan Nejem  on 

when demonstrating a daylight simulation, shall the interior glazed areas be excluded from the calculation because light traveled through multiple layers of glazing

1
Tue May 27, 2014, 10:09 pm

Baseline HVAC system type

CS-v4 EAp2:Minimum energy performance
posted by  Ricardo Sá  on 

I'm currently working in a project of shopping mall (common areas + tenant areas) pursuing LEED certification (Core&Shell).

1
Tue Nov 22, 2016, 5:27 pm

Consumable Materials for Equipment

EBOM-v4 MRp1:Ongoing purchasing and waste policy
posted by  RYAN BEN SABILALA  on 

Just want to make sure if the consumable materials like oils, gaskets, O-rings etc.

1
Fri Feb 24, 2017, 5:46 pm

Contact at USGBC regarding LEED ND

ND-Plan-v4 MPR3:Must comply with project size requirements
posted by  Martine Desbois  on 

I am looking for a contact at USGBC to discuss our project. Would it be possible to have a contact person name and email or phone number?

1
Fri Jun 26, 2015, 3:30 pm

green roofs

NC-v4 WEp1:Outdoor water use reduction
posted by  Geoffrey Katz  on 

Hello all, Under Option 1 are vegetated (green) roofs considered as part of the landscape that requires (or does not require) a permanent irrigation system?

1
Wed Mar 29, 2017, 3:11 pm

LEEDv4 Homes - Parking Structure

Homes-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sara Greenwood  on 

It does not appear that parking structures are required to be included in the LEED-H boundary, however if the structure is being built to service a student housing building and energy modeling incl

1
Tue Jun 20, 2017, 3:11 pm

Functional Entry for Addition Project

NC-v4 LTc5:Access to quality transit
posted by  Eric White  on 

Our project is a four storey addition to an existing four storey building.

1
Tue Aug 30, 2016, 11:26 pm

DES Option 1 - Baseline System

NC-v4 EAp2:Minimum energy performance
posted by  Jay patel  on 

I am modeling a new building(Laboratory/office) on a university campus following LEED v4 Option 1, Whole Building Energy Simulation. New Building is 3 story and 69,500 sq.ft .

1
Tue Aug 1, 2017, 2:56 pm

Fundamental Refrigerant Management: Leed v4- Campus Credit

EBOM-v4 EAp4:Fundamental refrigerant management
posted by  Patricia Andrasik  on 

We are attempting to get the Fundamental Refrigerant Management credit as a campus credit. We are going to peruse the economic feasibility option with leakage tracking.

1
Wed Jun 11, 2014, 4:54 pm

Measuring through connection interval distance

ND-Plan-v4 NPDc6:Connected and Open Community
posted by  Ian Scott  on 

Where the project boundary is located on the project side of adjacent ROW is through connection distance measured between ROW centrelines at the project boundary or at the adjacent ROW centreline.

1
Tue Nov 29, 2016, 10:07 pm