Building with no FTE
NC-v4 LTc6:Bicycle facilitiesposted by Nathan Gauthier on
Has anybody proposed eliminating showers and / or long-term bike storage in a building with no FTE? We're renovating a small wood-frame classroom building with 8 classrooms.
Secure Long-Term Storage - "Within" 100'-0" Feet
CI-v4 LTc4:Bicycle facilitiesposted by Kristina Bach on
Our project is looking at providing an enclosed long-term bicycle storage area which is only accessible by key-card to FTE's who have signed the bicycle access agreement.
ASHRAE 90.1-2010 VRF Requirements
NC-v4 EAp2:Minimum energy performanceposted by Rudolph Carneiro on
Does anyone know wether or not evaporator input power should be included in the efficiency calculation of a VRF system?
Recommended values for Met and CLO and size of zones
NC-v4 EQc5:Thermal comfortposted by Sandra Holmström on
Hi! Is there any recommended value för Met and CLO that you must use when you perform your calculation of PMV/PPD etc? Is there any recommended size of the zones that require thermal comfort Cont
Only 200 yards to a bike network seems harsh!
CI-v4 LTc4:Bicycle facilitiesposted by Susan Di Giulio on
We have a LEED-CS v2009 project in the heart of downtown LA: 2 blocks from a major Metro train hub, 4 blocks from one complete street with protected bike lanes and 3 blocks from another.
Maximum Number of Cycles
NC-v4 WEc3:Cooling tower water useposted by Apoorv Goyal on
Hi, based on a water test report, if the number of cycles already exceed 10, does that mean that both points are achievable?
Required Documentation: All Projects for Site Management credit
EBOM-v4 SSc5:Site managementposted by JOHN COOK on
Hello, Is there an example of an acceptable "air quality protection log" that USGBC is looking for in this credit?
Water Use Reduction points
NC-v4 WEp1:Outdoor water use reductionposted by UGC/GPRO Office Account on
Hi All, I am gathering all the water use reduction points in v4.
Social equity within the community
NC-v4 INc1:Innovationposted by Miriam Ramirez Baumgarten on
Hi, Our project is pursuing the Pilot credit "Social equity within the community" with Option 1: Complete The SEED Evaluator Parts 1 and 2.
Base building HVAC Efficiency and Baseline & Proposed WWR
CI-v4 EAp2:Minimum energy performanceposted by ESD Engineer on
Hi, The projects space is served by the base building AHU and Chiller plants. Efficiency of which don't meet the min prescribed efficiency as per ASHRAE 90.1-2010.