Forum quick links
Sustainable Agriculture and
EBOM-v4 MRc1:Purchasing - ongoingposted by Meier Corporate Account on
Is there a way, outside creating another pilot program, to update the spreadhseet for the Purchasing - Ongoing credit? 1. Food Alliance is no longer a viable entity.
WEp1 and c1: Indoor Water Use Reduction
CI-v4 WEp1:Indoor water use reductionposted by BEE Incorporations on
Hi! We understand that all newly installed water fixtures must be WaterSense labeled.
EPD Option 2 - Compliance
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Alexa Stone on
For Option 2 - How do you determine credit compliance with an industry-wide EPD?
Waste Stream Study: Address top 4 only, or any 4 out of the 5?
Retail-NC-v4 MRp1:Storage and collection of recyclablesposted by Greg Romanczyk on
The credit requirement indicates a waste stream study needs to be conducted to identify the project's top five recyclable waste streams.
When covering a wide range of products
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Akira Kataoka on
A company is planning to publish an EPD(s) for their gypsum board products.
Core and Shell project with public bike scheme adjacent
CS-v4 LTc5:Access to quality transitposted by Sean Hogan on
Our project seeking C&S certification for and existing building redevelopment.
Glare requirement exemption
NC-v4 SSc6:Light pollution reductionposted by David Makee on
I saw a similar question regarding uplight, but is it possible for a building-mounted light fixture to be excluded from the glare requirements if it is shielded from the lighting boundary by anothe
Occupancy Category
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Meier Corporate Account on
I am working through the Minimum IAQ Performance calculator and I need a recommendation.... Our facility is 105,000 quare feet (ground level).
ASHRAE version for taller buildings
Mid-Rise-v4 EQp1:Ventilationposted by S. Sachs on
We are working on a multi-family residential building, which is 7 stories tall.
Envisioning this credit for condo building in Harlem
EBOM-v4 LTc1:Alternative transportationposted by Charlotte Matthews on
Residents and condo owners rarely respond to surveys.