Forum quick links
Compartmentalization
NC-v4 EQp2:Environmental tobacco smoke controlposted by soha yamani on
I am really confused with the language of this credit , can you please clarify the below 1- Does EACH unit have to be sealed and Compartmentalized or only Residential units allowing smoking?
Existing Conditions
NC-v4 WEp1:Outdoor water use reductionposted by Craig Graber on
This is Josef Abboud from Atelier Ten For outdoor areas within a renovation project scope (i.e.
University Campus with Solar, not in Project LPB
CI-v4 EAc4:Renewable energy productionposted by Sara Zoumbaris on
Our project is the renovation of an existing university building.
Concrete and Asphalt from Demolition
NC-v4 MRc5:Construction and demolition waste managementposted by James Keohane on
What is the best way to include demolition materials such as concrete and asphalt in CWM calculation?
2 buildings = 100% = 5 points?
ND-v4 GIBc1:Certified green buildingsposted by Tommy Linstroth on
We are looking at doing 2 multi-family low-rise buildings. Each building would be LEED for Homes certified - so 100% of the floor area would be certified over 69 units.
timeframe of applicable products
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by emily reese moody on
I swear I saw this info somewhere, but cannot locate it now. What's the timeframe of product purchase in terms of applicability for this credit (and inclusion with LEED documentation/compliance in
Amount of rainwater treated with a storage tank
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Hi all, I'm working on a project that is pursuing LEED certification.
Automatically earn credit?
CI-v4 IPc1:Integrative processposted by Maria Glädt on
Will you earn this credit automatically if your in a LEED v4 project which has been awarded with this credit?
Envelop Commissioning
CI-v4 EAp1:Fundamental commissioning and verificationposted by Peter Doo on
The LEED Online template provides selections for HVAC systems commissioning (4pts) or commissioning with monitoring (5pts). The LEED Reference Guide describes Enhanced Systems Commissioning (3-4pts
Project with no associated off-street parking
NC-v4 LTc8:Green vehiclesposted by Miriam Ramirez Baumgarten on
Hi! Could a project with no associated off-street parking achieve credit compliance by installing electrical vehicle supply equipment (EVSE) in a taxi station near the project and having signage i