Forum quick links
Determining site area on lot with multiple buidings
Mid-Rise-v4 SSc2:Rainwater managementposted by Phil Vanderloo on
Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.
Errors in Outdoor Water Use Reduction Calculator
EBOM-v4 WEc1:Outdoor water use reductionposted by Stephanie Donovan on
I noticed the worksheet has some errors: a) "Baseline Calculation" tab: the Watering Demand column is subtracting rainfall from ETo, instead of ETo being subtracted from rainfall b) "Baseline Cal
Copy area in office - acoustical treatment
CI-v4 EQc9:Acoustic performanceposted by Leticia SooHoo on
Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.
Documentation upload to LEED Online
CS-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
We are just getting ready to submit LEED CI V4 commissioning documents, and I noticed that it only requests that we upload the table of contents for both the Final Cx Report and Ongoing Commissioni
Approved Deicers
EBOM-v4 SSc5:Site managementposted by Stephanie Donovan on
Hi Sam, I've been looking at deicers appropriate for this credit.
Window-sill
NC-v4 EQc8:Quality viewsposted by Antonio Macedo Filho on
I would like to know if there is a maximum obstruction height of views for option 1.
Measurement & Verification
CS-v4 EAc3:Advanced energy meteringposted by Ciaran McCabe on
Has the credit criteria for Base Build M&V been removed from V4 Core & Shell or has it been built into another credit ?
Dry cooling tower
NC-v4 WEc3:Cooling tower water useposted by Sara Johansson on
Hi, If a project has dry cooling, a type of cooling tower, can it than get this point?
Meeting room ID+C: CI certification
CI-v4 MPR3:Must comply with project size requirementsposted by Silvia Ruiz on
Hi A client asked us if they can earn a LEED ID+C: CI certification for a 968 sqft meeting room renewal.
GreenWizard
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Alyssa Schear on
Did GreenWizard cease to exist? I keep getting an error when I go to their webpage?