Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Determining site area on lot with multiple buidings

Mid-Rise-v4 SSc2:Rainwater management
posted by  Phil Vanderloo  on 

Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.

1
Mon Mar 7, 2016, 7:16 pm

Errors in Outdoor Water Use Reduction Calculator

EBOM-v4 WEc1:Outdoor water use reduction
posted by  Stephanie Donovan  on 

I noticed the worksheet has some errors: a) "Baseline Calculation" tab: the Watering Demand column is subtracting rainfall from ETo, instead of ETo being subtracted from rainfall b) "Baseline Cal

1
Wed Mar 9, 2016, 7:58 pm

Copy area in office - acoustical treatment

CI-v4 EQc9:Acoustic performance
posted by  Leticia SooHoo  on 

Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.

1
Thu Jan 19, 2017, 9:22 pm

Documentation upload to LEED Online

CS-v4 EAc1:Enhanced commissioning
posted by  Erin Rowe  on 

We are just getting ready to submit LEED CI V4 commissioning documents, and I noticed that it only requests that we upload the table of contents for both the Final Cx Report and Ongoing Commissioni

1
Wed Aug 16, 2017, 12:28 am

Approved Deicers

EBOM-v4 SSc5:Site management
posted by  Stephanie Donovan  on 

Hi Sam, I've been looking at deicers appropriate for this credit.

0

Window-sill

NC-v4 EQc8:Quality views
posted by  Antonio Macedo Filho  on 

I would like to know if there is a maximum obstruction height of views for option 1.

1
Mon Aug 28, 2017, 11:30 am

Measurement & Verification

CS-v4 EAc3:Advanced energy metering
posted by  Ciaran McCabe  on 

Has the credit criteria for Base Build M&V been removed from V4 Core & Shell or has it been built into another credit ?

1
Sat Jan 7, 2017, 7:12 pm

Dry cooling tower

NC-v4 WEc3:Cooling tower water use
posted by  Sara Johansson  on 

Hi, If a project has dry cooling, a type of cooling tower, can it than get this point?

1
Thu Jan 11, 2018, 9:13 pm

Meeting room ID+C: CI certification

CI-v4 MPR3:Must comply with project size requirements
posted by  Silvia Ruiz  on 

Hi A client asked us if they can earn a LEED ID+C: CI certification for a 968 sqft meeting room renewal.

1
Thu Apr 6, 2017, 5:23 pm

GreenWizard

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Alyssa Schear  on 

Did GreenWizard cease to exist? I keep getting an error when I go to their webpage?

1
Tue Mar 29, 2016, 12:58 am