Forum quick links
Energy Effiicency Measures
CI-v4 EAc2:Optimize energy performanceposted by Kalyan Nishtala on
Under option one for compliance (energy simulation), which measures can credit be taken for?
retail definition?
ND-Plan-v4 SLLc4:Bicycle facilitiesposted by Ian Scott on
I am curious what uses "retail" would include. Have searched for a definition but can't find one.
Do the bike racks need to be covered? Definition of 'secure'?
CS-v4 LTc6:Bicycle facilitiesposted by Jay Murray on
This is a commercial project, LEED v4 CS. We have a requirement of 4 racks for visitors and 7 racks for FTE, we want to put a 12 space rack within 100 feet from the main entrance.
Recycling estimates from similar projects
CS-v4 MRp1:Storage and collection of recyclablesposted by Martin Stowell on
Since this is a C&S project, we need estimates for expected volume of recycling. Can you provide any guidance on where to find case studies or historical data or similar buildings?
Monitoring requirements - Naturally ventilated residential units
CS-v4 EQp1:Minimum indoor air quality performanceposted by Mario S. on
We are working on a residential building where split AC units are provided in every room for each unit with no mechanical ventilation.
Glass skylights and existing roof
NC-v4 SSc5:Heat island reductionposted by Jonathan Hickerson on
I have an existing metal standing seam roof that is historic and will remain, and there is a new skylight going in.
Rideshare Bike Rentals
NC-v4 LTc5:Access to quality transitposted by Samantha Varela on
Hi, My project is located within 1/4 mile (400 meter) walking distance of a Citi Bike Rental station that when at full capacity holds 14 bikes. Would this be considered ride share?
Option 2. Connectivity
ND-Plan-v4 SLLc1:Preferred locationsposted by Sarah Kearney on
I want to make sure I understand this correctly.
Does gravel count?
NC-v4 SSc3:Open spaceposted by Harvard University Green Building Services on
Does gravel count as vegetated open space where there are bushes and other plantings in the gravel area?
recycling of existing floors or installation waste
EBOM-v4 MRc5:Solid waste management - facility maintenance and renovationposted by Diane Martel on
I tried to find language and have not found any. what are the parameters on waste management?