Regulated vs. Unregulated??
NC-v4 EAc2:Optimize energy performanceposted by Edgar Arevalo on
I'm filling out the information from the energy model to the LEED v4 Minimum Performance Calculator and i noticed a check mark next to each end-use when filling out energy consumption and power dem
cottages on poles on water
NC-v4 MPR1:Must be in a permanent location on existing landposted by Emmanuel Pauwels on
We are looking into the possibility to certify a holiday resort located on an island.
Daylight and quality views measurement in a special building
EBOM-v4 EQc5:Daylight and quality viewsposted by Ana Villarroya on
We're working on a case of a building complex that aims to achieve a LEED certification within some years. The complex is a sanctuary, and it includes several hospitality buildings and a shrine.
LCA Part C – End of Life
NC-v4 MRc1:Building life-cycle impact reductionposted by Petr Vogel on
The credit says cradle to grave so it is obvious that this part has to be included. Is there any guidance how should it be included?
Medical Equipment Specification
Healthcare-v4 WEp2:Indoor water use reductionposted by Gabriela Crespo on
Dear all, We're working on a HC project in Mexico, but we seem to be having trouble complying with what is required for process equipment in table 5 of this pre-req.
BPDO Calculator / Total materials cost
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Kevin Wilcox on
Looking for clarification on ‘Total materials cost’ number from BPDO calculator (Materials tab). Where does ‘Total materials cost’ number come from?
DEMAND RESPONSE energy modeling
NC-v4 EAc2:Optimize energy performanceposted by Habitech Distretto Tecnologico Trentino on
How is it possible to take advantage of energy use reduction due to DR systems in EAp2-EAc1 energy modeling? Is there any reference guide or document as those for the "key cards" for example?
Buildings w/ programmatic dependency/architectural cohesiveness
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
I have a client that is developing an open-air type shopping center (i.e., the tenant stores are arranged in blocks that open to exterior interconnecting walkways) and is willing to pursue LEED cer
The year of metering
EBOM-v4 EAp2:Minimum energy performanceposted by Vindio Corro on
Must be the year of metering after the registration of the project or can be used a year of metering of before?
REACH
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Jonathan Weiss on
I see that REACH is listed as an international compliance path, what about a US based project that is using some REACH compliant materials - some specialized application flooring, for example, is m