Forum quick links
NC-v4: Rainwater management
NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project? The initial pond will be des
DES in non-roof measures
CS-v4 SSc5:Heat island reductionposted by on
Hello, I am working in a DES heating and cooling thanks to sea water and I would like to know if it is taking in account as a non-roof measure.
Energy performance vs. Energy Cost
Mid-Rise-v4 EAc1:Annual energy useposted by Eesmyal Santos-Brault on
Hi - It seems that this version of the rating system is targeting energy performance improvement over energy cost budget. Is that right?
Brownfield site
Hospitality-NC-v4 LTc3:High priority siteposted by Karen Heet on
Howdy! Can this credit be achieved if the project is on a former brownfield site - meaning that it was identified and already remediated by the previous owner? Many thanks!
Confidential space
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Ameet AA on
Hi, The project is a 3-storey high building, single tenant. The tenant already occupies the building, and going to renovate about half of the floor area.
Autocontrol vs smart sensor-activated faucets and duration times
NC-v4 WEp2:Indoor water use reductionposted by Heather DeGrella on
Per the LEEDv4 Reference Guide "Duration-based savings from auto-control faucets w/ automatic fixture sensors or metering controls are no longer allowed in the design case.
EPDs and Manufacturing Dates
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Michelle Rosenberger on
Does an EPD need to be issued before the manufacturing date of the product installed? Or do we just need to provide an EPD for that product when we submit for certification?
CI in a CS project
CI-v4 LTc2:Surrounding density and diverse usesposted by Sara Johansson on
If a tenant chooses to certify ith CI in an already CS v.4 certified building (that has earned full points for Surrounding Density and DIverse Uses as well as Access to Quality Transit, Bicycle Fac
What is the baseline assumption for this credit?
CI-v4 IPc1:Integrative processposted by Betty Liu on
Hi All, We are designing a CI v4 office space in an existing high-rise building.
CO2 monitoring densely occupied spaces, exemption rooms <150 sf
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Maria Porter on
Why are not small rooms (less than 150 sf) exempt from the CO2 monitoring requirements? In EB:OM and several other places and standards they are.