Clarification on LEEDv4 Low-Emitting Materials credit
NC-v4 EQc2:Low-emitting materialsposted by Jason Grant on
In the IEQ: Low-Emitting Materials credit, under the heading Emissions and Content Requirements, section on General emissions evaluation, it says that “building products must be tested and determin
Amtrak and Megabus
NC-v4 LTc5:Access to quality transitposted by Sara Zoumbaris on
Our project is shy of the second weekend trip threshold (108) by 1-ride. We are within walking distance of Amtrak, which has regularly scheduled pickups at our location twice a day.
What transit type is the Subway (underground) System?
CI-v4 LTc3:Access to quality transitposted by Olga Yuil on
What transit type is the Subway (underground) System?
Is it light rail, heavy rail or commuter rail?
Existing building curtainwall reduced glazing %
NC-v4 EAp2:Minimum energy performanceposted by Wade Cooper on
I have an existing envelope that is a complete curtain wall assembly that is to be replaced. The overall WWR for the building is over 70% currently and is being removed and redesigned to
Option 1: which software shall we use??
NC-v4 EQc7:Daylightposted by Ricardo Sá on
Hi,
we're experiencing lots of difficulties to correctly assess this credit. Some notes:
Fan - interior ventilation EFLH
NC-v4 EAp2:Minimum energy performanceposted by Michael on
Hi,
i'm dealing with EFLH for interior ventilation in baseline and propose, over 8000h/year, double than another ones such us space cooling and receptacle EFLH, <4000h/year?
Client (a police facility) has no fleet Green vehicles. They do have sufficient public parking to implement this credit.
NC-v4 LTc8:Green vehiclesposted by Lawrence Lile on
This police facility has a secure area for police cruisers, SWAT vehicles, and so on. None of the fleet vehicles are Green vehicles.
TSLA upload - where should we do it?
CS-v4 MPR1:Must be in a permanent location on existing landposted by Instra Ingenieros on
Dear all,
Management of on site runoff at a neighboring retention pond
NC-v4 SSc4:Rainwater managementposted by Jason Garvens on
I'm working on a project being built in a designated industrial park area.
Demand Response Program available but building can't meet requirements
NC-v4 EAc4:Demand responseposted by Jason Garvens on
Can a project still be eligible to apply for the single point for Case 2 if the project's utility does offer a DR program but the project doesn't sign up for it due to the requi