Forum quick links
How to simplify a complex building in a simulation model
NC-v4 EAp2:Minimum energy performanceposted by Hagen Bork on
Hi there,
Modeling "cool roof"
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
The project we are modeling is located in climate zone 6. The proposed case has decided to use “cool roof: with SRI of 0.44 (reflectance 0.39 and emittance 0,89).
Airport External Lighting - Airside
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi,
CALGreen Projects and BUG Rating
NC-v4 SSc6:Light pollution reductionposted by Michelle Rosenberger on
Hi all,
HPD v2.1 - Statement about Special Conditions when "No" is indicated for Characterized, Screened, or Identified
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
I’m currently reviewing a HPD v2.1 for LEED v4 Building Product Disclosure and Optimization – Material Ingredient Option 1.
Disabled parking facility
CI-v4 LTc5:Reduced parking footprintposted by werdah shahid on
Daylight - Option 2 Attached Furniture Systems
CI-v4 EQc7:Daylightposted by Amanda Gillen on
I am working on the documentation for Daylight using Option 2. The Credit form asks that you "describe attached furniture systems included in the simulations". What exactly are they refering to?
Regional material distance calculation method
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Lawrence Rennell on
According to LEED 2009, there were alternate distance calculations available that applied to products shipped by rail or ship.
Greenfield
NC-v4 SSc2:Site development - protect or restore habitatposted by Karl Heitman on
Our 18 acre project site includes non-build-able waterfront with water detention.