Forum quick links
Envelope Commissioning in CI-v4
CI-v4 EAc1:Enhanced commissioningposted by Heather DeGrella on
Hi All,
Additions to Existing Cold Storage Facility
NC-v4 EAp1:Fundamental commissioning and verificationposted by Dustin Norton on
I am working on a project that includes a large existing cold storage facility that will essentially double in size after renovations.
Flush out using building emergency exhaust ventilation system
Retail-CI-v4 EQc4:Indoor air quality assessmentposted by Mahesh Shankar on
The project is a retail store which is not flushing out the space using outdoor air. The exhaust ventilation system of the building is used to
Option 2 - Example
NC-v4 EQc5:Thermal comfortposted by Konstantina Kalliakoudi on
Hello to all,
I have an European project and I will follow Option 2. But I have difficulties in understanding the Method.
Materials inside the building
NC-v4 EQc2:Low emitting materialsposted by Konstantina Kalliakoudi on
Hello to all,
In my understanding this credit "Low emitting materials" concerns materials inside the building, and not outside. Is this right?
Thanks
Furniture always in scope of work?
NC-v4 EQc2:Low emitting materialsposted by Raphael Sperry on
I've noticed that the LEED reference guide says "Furniture is considered part of the scope if it is installed at the time of occupancy, regardless of who specified or provided it." And I've never
How to calculate multi-level Decks / Patios
NC-v4 SSc5:Heat island reductionposted by Sara Hickman on
The project will have several patios / decks throughout, many of which will be covered by a large cantilever above (being the building itself).
Construction and Demolition Waste Management Plan – Sample
CI-v4 MRc6:Construction and demolition waste managementposted by milo valenti on
Construction and Demolition Waste Management Plan – Sample Are there template sample form in Excel format for our recycling yard?
Eap2-c2 Group ceritification energy modeling
CS-v4 EAp2:Minimum energy performanceposted by FABIO VIERO on
Hi,
Intermittent ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dustin Smith on
Has anyone successfully used scheduled intermittent ventilation for a constant-volume exhausted space to avoid overventilation, and to minimize energy usage, in a warehouse or similar space?