Permanently installed products definition.
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by shashank gangil on
For MR credits, what exactly contributed as permanently installed product? Does AC ducts and insulation counted here?
Fixtures within Lab Facility - Applicable
NC-v4 WEp2:Indoor water use reductionposted by RDK E&S on
Hello,
I'm working on a lab / processing facility aiming for LEED v4 NC certification.
SSpc41 Walkable Project Site
NC-v4 INc1:Innovationposted by Helene Lefkowitz on
Our project team pursued this pilot credit and found it to be very achievable for projects in urban settings.
5 Regional Priority Credits
NC-v4 RPc1:Regional priorityposted by Nathan Gauthier on
I was checking the RP credits for LEED v4 NC in Cambridge today and there are only 5 listed (not 6). Boston is the same way.
PV Lease Agreement Clarification
NC-v4 EAc5:Renewable energy productionposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
Our project intends to provide land, under a min. 10-year lease, to the local power provider who will install a min. 1MW PV system.
Exemplary Threshold
NC-v4 LTc5:Access to quality transitposted by Jane Bills on
I have a Core & Shell project with the following:
RAIL:
249 Weekday 117 Weekend
BUS:
Default values used in calculator
NC-v4 EAc6:Enhanced refrigerant managementposted by RDK E&S on
Are refrigerant GWPr and equipment life (years) typically shown on cutsheets, or are default values sufficient for this credit?
Compliance to ASHRAE 90.1-2010 - Dimming Lights
CS-v4 EAp2:Minimum energy performanceposted by Summer on
I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking.
Compliance to ASHRAE 90.1-2010 - Dimming Lights
CS-v4 LTc7:Reduced parking footprintposted by Summer on
I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking.