Forum quick links
PV installation built and commissioned prior to Occupancy
CI-v4 EAc4:Renewable energy productionposted by Gary Shlifer on
Our project is a 6 story office building, 250,000 sq feet. It is underconstruction.
Multi Scene Control for Lighting
NC-v4 EAp2:Minimum energy performanceposted by Gabriela Crespo on
Dear all, We're working on a LEED v4 NC project in Mexico.
Table 2 minimum compliance threshold
Schools-NC-v4 WEc2:Indoor water use reductionposted by Bryna Dunn on
I'm curious about whether other teams have had success with meeting the requirements of Table 2 in terms of the minimum amount of laundry that must be done per year to qualify for the point.
Master Site / Campus Innovation Credits
NC-v4 INc1:Innovationposted by Adam Fitzpatrick on
Can Innovation and/or Regional Priority credits be included in a campus master site submission? Or must these credits be awarded at the project level?
EPA CGP 2003/2012
NC-v4 SSp1:Construction activity pollution preventionposted by Charalampos Giannikopoulos on
Hi all! Is anyone aware of a table summarizing the changes that were introduced by EPA CGP 2012 when compared to the 2003 version?
Entryway systems in airports
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
Hi,
Historic Building Modeling for LEED
NC-v4 EAc2:Optimize energy performanceposted by Sarah Gudeman on
Okay, have a dormitory building renovation project that includes the following:
Can an outdoor mall entrance courtyard count towards the 30% open space requirement?
NC-v4 SSc3:Open spaceposted by B. Guzman on
Can an outdoor mall entrance courtyard count towards the 30% open space requirement, providing 25% of vegetated areas using planters and accomodating benches for outdoor social activities?