Forum quick links
Outdoor Water Feature (decorative water fountain)
NC-v4 WEp1:Outdoor water use reductionposted by Sophie Kerr on
Are exterior water features included in outdoor water calculations?
Filtered water faucet in Hotel Dwelling Units
NC-v4 WEp2:Indoor water use reductionposted by on
I wrote a couple weeks back, with some questions on the "v4v4 1_Indoor Water Use Reduction Calculator." I just discovered that the dwelling units will have two faucets, one for hand washing,
Using Schools option 2 - Pedestrian Access for a Community Service Center
NC-v4 LTc4:Surrounding density and diverse usesposted by nancy picard on
Has anyone ever seen new construction projects where an exception was made for them to use Schools option 2 - Pedestrian Access even if applying for another type pf building?
LRV for baffles
CI-v4 EQc6:Interior lightingposted by Carina Clark on
Curious the best way to calculate SF for spaces that have paint on the structure as well as baffles that hang below.
Higher MERV rated filters
Mid-Rise-v4 EQp5:Air filteringposted by Laura McComb on
Does LEED v4 no longer encourage buildings to use MERV 10 and MERV 13 filters? I've combed though the rating system and no longer see these mentioned.
MR 87 Verified Construction & Demolition Recycling Rates
CI-v4 INc1:Innovationposted by Bonny Gray on
Has anyone had luck with MR 87 pilot? Obviously, one needs a certified facility in your project area to accomplish this point and we are lucky we have one. We have earned this pilot poi
Healthcare & Schools - Exterior Requirements
Schools-NC-v4 EQc2:Low emitting materialsposted by Jennifer Gleisberg on
What are the exterior paints & coatings requirements for healthcare and school projects with Version 4?
Base Building HVAC Systems
CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi,
I am modeling one floor of a 31 story building, I would like to verify the following:
Time limit for a project completion
Healthcare-v4 MPR2:Must use reasonable LEED boundariesposted by Mario S. on
An existing building will be under major renovation and we plan is to get it certified.
For technical and administrative reasons, the project completion may take around 7 years.