Forum quick links
How to model lighting control requirements in baseline & proposed design energy model
CI-v4 EAp2:Minimum energy performanceposted by Amal Venugopal on
Hi All,
Government Required Irrigation - Exemption?
NC-v4 WEc1:Outdoor water use reductionposted by Sara Goenner Curlee on
One of my projects is being required to do some frontage improvement work along with the project itself.
Rainwater cleaned in a swales and drained into a nearby lake to preserve it
NC-v4 SSc4:Rainwater managementposted by Pooja Sannamani on
Our project consists of a building in a waste water treatment plan (WWTP) facility.
Project in a City-Provided Parking District
CI-v4 LTc5:Reduced parking footprintposted by Dane Andersen on
Hello,
Estimating Energy Use for a Laboratory
CI-v4 EAc6:Green power and carbon offsetsposted by Parker Hall on
My project pursued optimized energy performance option 2 - prescriptive compliance. An Energy model was not created for this building, so I intend to calculate out energy use via the U.S.
Baseline fan motor efficiency
NC-v4 EAp2:Minimum energy performanceposted by Simon Dellacher on
System fan power is calculated per ASHRAE 90.1-2010 Appendix G3.1.2.10, where for the systems 3 through 8 fan motor efficiency is part of the formula.
Koolshade as glare-control
NC-v4 EQc8:Quality viewsposted by Audrey LEDESERT on
We are working on a project that plans to put a Koolshade glare control (microlouver - https://www.smartlouvre.com/).
System without simultaneous Cooling and Heating
Hospitality-NC-v4 EQc5:Thermal comfortposted by Ricardo Sá on
Dear All,
MRp2/c5 -- Can we count shipping dunnage returned to precast manufacturer as material reuse?
NC-v4 MRp2:Construction and demolition waste management planningposted by Terry Thornsbury on
We have a large (800,000sf) project that is being constructed primarily using precast floor decks and architectural wall panels.
CLASS 1 AIR SEPERATION DISTANCES_62.1 2010
NC-v4 EQp1:Minimum indoor air quality performanceposted by Fotis Kotsopoulos on
In case of a central AHU mounted on roof level supplying 100% (incl. run around coil) fresh air to office spaces: