Open-office workstations thermal comfort control
CI-v4 EQc5:Thermal comfortposted by Zsuzsanna Gidro on
Hi!
Alternate approach to collecting e-waste?
NC-v4 MRp1:Storage and collection of recyclablesposted by Renee Shirey on
I have a campus student housing project, thus the electronics in this building would be student-provided. Since collection of e-waste is still required, I am wondering if anybody has been suc
Basic question about Mid-Rise-v4 EQc7 language
Mid-Rise-v4 EQc7:Low-emitting productsposted by Kim Hutchinson on
This is probably an incredibly basic question for this forum, but I have been chasing it around in circles for hours and am hoping someone can give me a definitive answer. I am fairly new to
What counts in terms of "conditioned space"?
Healthcare-v4 SSc7:Places of respiteposted by Garrett Ferguson on
What types of conditioned spaces count towards places of respite? I'm assuming break rooms, waiting rooms, and sim?
LEED NC & Major Renovation, excluding parking garage
NC-v4 MPR2:Must use reasonable LEED boundariesposted by on
Hi,
Average daily visitors calculation
CI-v4 WEp1:Indoor water use reductionposted by Émilie Cormier on
Hi,
LEED AP only during design stage
NC-v4 INc2:LEED Accredited Professionalposted by on
The LEED project I am involved in LEED AP is currently under design stage review and is being constructed.
Letter of commitment
CS-v4 EAp3:Building-level energy meteringposted by Alessandro Zuanon on
Hi,
is it possible to submit a unique letter of commitment for building level energy metering and building level water metering?
Thanks,
Alessandro
Rainwater Reuse System shared by several campus buildings
NC-v4 WEp2:Indoor water use reductionposted by Ricardo Sá on
Dear All,
We are currently certifying a Campus with two buildings, quite different one from the other:
FAR of a retail unit within a Multi-Use Building
ND-Plan-v4 NPDc2:Compact developmentposted by Tim Nabholz on
Is there another way to count the FAR of retail in multi-storey building with residential above?