Forum quick links
LEED Boundary with road
Warehouses-NC-v4 MPR2:Must use reasonable LEED boundariesposted by Marine Cadier on
The project is a warehouse with a ringroad being built around it. The problem is that a section of the road is outside of the boundary.
Baseline Lab Systems
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
I got a comment on a project that said G3.1.1 exception c means that all qualifying lab spaces would be assigned to one system 5/7 for the whole building not one per floor. Is that correct?
Is "rainwater collected" considered "reclaimed water"?
NC-v4 WEp3:Building-level water meteringposted by Sara BENLOUBA on
Is "rainwater collected" considered "reclaimed water", I am very confused because according to the LEED guide definition, "reclaimed water" is like a kind of treated and purified wastewater.
Is "rainwater collected" considered "reclaimed water"?
NC-v4 WEc4:Water meteringposted by Sara BENLOUBA on
Is "rainwater collected" considered "reclaimed water", I am very confused because according to the LEED guide definition, "reclaimed water" is like a kind of treated and purified wastewater.
Project site part of a newly masterplanned area
NC-v4 LTc3:High priority siteposted by Nermin Hegazy on
Hello!
Fine or bulky material
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In order to specify the lighting power density according to table 9.6.1, what is the definition of "Fine material storage"?
Innovation Credits Documentation
NC-v4 INc1:Innovationposted by on
May be a dumb question -- but how do I go about documenting innovation credits? In the innovation form it asks us to list the credit then provide documentation of it.
Tenant services and submetering
CS-v4 WEc4:Water meteringposted by Clara Sosa D´Este on
Hi everyone, we are working on a shopping mall and we wanted to know, in the case that a tenant of the project is going to build bathrooms and kitchens for their particular business, if we have to
Tenant contracts their own electrical power
CS-v4 EAp3:Building-level energy meteringposted by Clara Sosa D´Este on
Hi everyone, we wanted to know if, in the case a tenant contracts their own electrical power for their space, if we have to meter that line as well or if we have to meter only the base building pow
What is the difference between V01 form of V4 version and V4.1 version
Data-Centers-NC-v4 MRp1:Storage and collection of recyclablesposted by David LEBRET on
Hi, I'd like to know the difference between V01 form to be completed of version V4 and V4.1.
Thanks