Recyclables storage requirements for apartment units
NC-v4 MRp1:Storage and collection of recyclablesposted by Gail Vittori on
For a mid-rise apartment building, are there specific requirements for what each individual apartment unit needs to provide to fulfill this credit, such as showing built-in recycling bins in t
Project Clarification Request: MPR2 & Rating System
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Olawale Taiwo on
A client has approached our team to review a project proposal intended for LEED certification, it is not a typical project, so some assistance at providing clarification per our concerns
Thermal comfort using thermal dynamic simulation
NC-v4 EQc5:Thermal comfortposted by Eduardo Vidal Kume on
Hi! Does anyone have experience with LEED Credit EQc5 Thermal Comfort using thermal simulation?
Radon Requirements for LEED v4 - Residential/Dwelling Units
NC-v4 EQp1:Minimum indoor air quality performanceposted by Chris Wilson on
We are working on a five-story student dormitory including a partial basement area in EPA Radon Zone 1. Are we required to follow the guidance for 'residential only' projects in high-risk are
Habitat / endangered species range
NC-v4 LTc2:Sensitive land protectionposted by Jorge Lopez de Obeso on
I have made the corresponding search to corroborate that my project is not within a sensitive land.
Submeter on exterior hose bibs
NC-v4 WEc4:Water meteringposted by Jason Garvens on
Is this credit's intent satisfied by having a second submeter serving a buildings exterior hose bibs (in addition to a DHW sub meter)?
Manual controls - remote control device
NC-v4 EQc6:Interior lightingposted by A&L SUSTENTABILIDADE on
The EQ credit Interior Lighting – Option 1 - Lighting Control states that “switches or manual controls must be located in the same space as the controlled luminaires.
Constant volume AHUs - Monitoring requirements AHU status On/Off
NC-v4 EQp1:Minimum indoor air quality performanceposted by Alessandro Zuanon on
Dear all,
EQ Overview: Warehouse Quality Views requirement?
NC-v4 EQc8:Quality viewsposted by Instra Ingenieros on
According to LEED v4 EQ Overwiew " Table 2.
EV's owned by a Third-Party?
NC-v4 LTc8:Green vehiclesposted by Randi B. on
Given that all reference guide requirements are met concerning the actual equipment that is installed, is a project required to own and operate the EV chargers or could they work with a 3rd party e