Calculating Baseline Fan Power and CFM?

NC-v4 EAp2:Minimum energy performance
posted by  Rajat Wadhwa  on 

How should I calculate the Fan CFm and power for Baseline LEED Model, Autosize the baseline system , then use Q=mCpDeltaT to calculate fan CFM and then find out the HP and use pressur adjustment fo

7
Sat Apr 5, 2025, 2:20 pm

Luminance of less than 2,500 cd/m2 between 45 and 90 degrees from nadir

NC-v4 EQc6:Interior lighting
posted by  Henri Barten  on 

Hello, i'm new into the LEED requirements.

My customer ask me if we have light fixtures with a luminance of less than 2,500 cd/m2 between 45 and 90 degrees from nadir.

7
Thu Apr 3, 2025, 6:47 pm

Option 1, Path 3. Streamlined DES Modeling

NC-v4 EAp2:Minimum energy performance
posted by  Nasim Mirian  on 

Hi,

I am trying to submit for LEED v4 for a campus building which is served by the campus central plant.we are taking Option 1, Path 3. Streamlined DES Modeling. 

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Thu Apr 3, 2025, 4:45 pm

VOC limit of Aerosol Adhesives

NC-v4 EQc2:Low emitting materials
posted by  L W  on 

Hi All,In LEED v4 and 4.1, is there a limit on the VOC content of aerosol adhesives, and if so what is it?

10
Default Avatar
Sustainability Project Engineer
Balfour Beatty US
LEEDuser Basic Member
0 thumbs up
Wed Apr 2, 2025, 9:35 pm
6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Apr 2, 2025, 9:11 pm

Rainwater tank for irrigation

NC-v4 WEp1:Outdoor water use reduction
posted by  Julio Fernandez Amodia  on 
Hi to all, I am currently working on this credit compliance for a large landscape area with a majority of native and adaptive plants.
2
Wed Apr 2, 2025, 11:47 am

Historical building and Existing building part of connected structure

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Edgar Arevalo  on 

I have courthouse project that involves two existing buildings being connected with a newly constructed third building.  Since one of the existing buildings connected to the third one is class

1
Tue Apr 1, 2025, 5:43 pm

Green-e energy certificate accounted for in EA credit - v4 x v4.1

NC-v4 EAc2:Optimize energy performance
posted by  A&L SUSTENTABILIDADE   on 

Our project is registered under the LEED v4, but we have substituted the EAc5 and EAc7 with the EA credit Renewable Energy from LEED v4.1, we intend to use the Tier 2 and purchase Green-e Energy ce

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Apr 1, 2025, 8:24 am