Forum quick links
Open-grid pavement system - is gravel inside the openings compliant?
NC-v4 SSc5:Heat island reductionposted by Aleksandra Prawda on
Hi all,
Internal Connectivity of a 3ha ND project. How to calculate?
ND-v4 NPDp3:Connected and open communityposted by Marine Petrosyan on
Hi, All!
Dear Community,
Calculating Baseline Fan Power and CFM?
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
How should I calculate the Fan CFm and power for Baseline LEED Model, Autosize the baseline system , then use Q=mCpDeltaT to calculate fan CFM and then find out the HP and use pressur adjustment fo
Luminance of less than 2,500 cd/m2 between 45 and 90 degrees from nadir
NC-v4 EQc6:Interior lightingposted by Henri Barten on
Hello, i'm new into the LEED requirements.
My customer ask me if we have light fixtures with a luminance of less than 2,500 cd/m2 between 45 and 90 degrees from nadir.
Option 1, Path 3. Streamlined DES Modeling
NC-v4 EAp2:Minimum energy performanceposted by Nasim Mirian on
Hi,
I am trying to submit for LEED v4 for a campus building which is served by the campus central plant.we are taking Option 1, Path 3. Streamlined DES Modeling.
VOC limit of Aerosol Adhesives
NC-v4 EQc2:Low emitting materialsposted by L W on
Hi All,In LEED v4 and 4.1, is there a limit on the VOC content of aerosol adhesives, and if so what is it?
Swimming Pools Baseline Definition
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Dear All,
Rainwater tank for irrigation
NC-v4 WEp1:Outdoor water use reductionposted by Julio Fernandez Amodia on
Historical building and Existing building part of connected structure
NC-v4 MRc1:Building life-cycle impact reductionposted by Edgar Arevalo on
I have courthouse project that involves two existing buildings being connected with a newly constructed third building. Since one of the existing buildings connected to the third one is class
Green-e energy certificate accounted for in EA credit - v4 x v4.1
NC-v4 EAc2:Optimize energy performanceposted by A&L SUSTENTABILIDADE on
Our project is registered under the LEED v4, but we have substituted the EAc5 and EAc7 with the EA credit Renewable Energy from LEED v4.1, we intend to use the Tier 2 and purchase Green-e Energy ce