Commercial Interior Project Information - Site Plan
CI-v4 MPR3:Must comply with project size requirementsposted by Edgar Arevalo on
I'm working on a commercial interior project for LEED v4 rating system. Under the Project Information form, it asks for site plan. What would I provide for a project located on the
Target Finder outside the US - Project in Europe
NC-v4 EAp2:Minimum energy performanceposted by Worood Shbeikat on
Hi, Is it true that a project outside the US (located in Europe) does not necessarily have the target finder results? for LEED accreditation?
Water test location
EBOM-v4 WEc3:Cooling tower water useposted by Clive Lacey on
Water test for Cooling tower should be done on site?
Re: C&S Energy Metering Strategy in Teanat Space
CS-v4 EAc3:Advanced energy meteringposted by Yoyo Shek on
Hi LEED user,
Lighting tab - unconditioned spaces
NC-v4 EAp2:Minimum energy performanceposted by Paul Caicedo on
Hello,
I am using DesignBuilder to export the minimum energy performance calculator spreadsheet; unconditioned spaces are not filled in the Tab Lighting.
Does recessed lighting under a canopy have to be accounted for in SSc6?
CS-v4 SSc6:Light pollution reductionposted by Wen Zhang on
We are working on a project where recessed pot lights are installled under a canopy.
Prefabricated or modular structure Buildings
NC-v4 MPR1:Must be in a permanent location on existing landposted by VISHAL JAIN on
Hello,
Would like to know more details on how "Prefabricated or modular structure Buildings" can be certified under LEED.
Innovation - PILOT - ergonomics approach for computer users
NC-v4 INc1:Innovationposted by Anina Mbilinyi on
I registered EQpc44 on March 4, 2021 with V4.0 project. The documents are complete and went to LEED Online to finalize documentation and the pilot credit was gone from the form.
Achieving prerequisite for project that was converted from VRF to DCS
CS-v4 EAp2:Minimum energy performanceposted by K Pomperada on
I am working with a project with design revisions from VRF to DES. How can we meet prerequisite if the the initial evaluation chiller efficiency is 0.63 kW/TR (Cooling Capacity is 2300TR