Forum quick links
Warehouse ventilation filtration system
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Gabriela Mena on
I am working on a warehouse project that has supply fans (wall mounted) to ventilate the space, we are pursuing the Enhanced IAQ credit <<Interior Cross Contamination Prevention>>, this
Food Service Equipment
CI-v4 EAc5:Enhanced refrigerant managementposted by ESD Engineer on
For a LEEDv4 CI project, does food service equipment such as ice cube machines, ice machines, and chiller freezers need to be documented?
Fully Unconditioned Cold Dark Shell Envelope Requirements
CS-v4 EAp2:Minimum energy performanceposted by elvin ruya on
Hi,
Advanced energy metering required for LEED when exempted by energy code?
Healthcare-v4 EAc3:Advanced energy meteringposted by Mark Benson on
Our building is following ASHRAE 90.1-2016 for code compliance purposes. Under section 8.4.3 Electrical Energy Monitoring, there is an exception for "Critical and Equipment branches or N
Unregulated loads
CS-v4 EAp2:Minimum energy performanceposted by Julio Fernandez Amodia on
Dear all,
BUG Method Clarificarion
NC-v4 SSc6:Light pollution reductionposted by Mankisha Veng Veng on
Dear Concern :-
I have doubts in BUG rating Mounting height
Core & Shell mandatory provisions
CS-v4 EAp2:Minimum energy performanceposted by Julio Fernandez Amodia on
Hi to all,
Project is not required to simulate baseline in 4 orientations
NC-v4 EAp2:Minimum energy performanceposted by Michael on
I would like to understand the line: the project is not required to simulate 4 baseline orientations because the building orientation is dictated by the site consideration. What does "Site Con
Does Option 2 apply to LEED for Retail?
Retail-NC-v4 EQc6:Interior lightingposted by Deborah Lucking on
Here is the Credit language "For at least 90% of the individual occupant spaces in office and administrative areas, provide individual lighting controls. In sales areas, provide controls that