Forum quick links
DES Systems
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
Dear LEEDUser friends,
DES Systems
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
Dear LEEDUser friends,
Indoor Water use Fixtures Calculations
EBOM-v4 WEc2:Indoor water use reductionposted by Michael Abdelmessih on
Hi everyone,
Question about Rainwater Tank volume
CS-v4 SSc4:Rainwater managementposted by Konstantina Kalliakoudi on
Hello LEED experts,
I have a project with a small Open space, so the LID techniques will be collection and reuse of rainwater via Rainwater cistern.
showers required in retail
Retail-NC-v4 LTc6:Bicycle facilitiesposted by Deborah Stadler on
For LEED v4 NC Retail are showers required? For LEED v4 CI Retail are showers required? The credit language and guide specifically appear to explicitly exclude showers in CI Retail, but
Do we need to included tenant area in renewable energy calculation for CS building?
CS-v4 EAc5:Renewable energy productionposted by Yoyo Shek on
Dear All,
Has anyone used Grasshopper for energy simulation and successfully submitted for LEED certification?
CS-v4 EAp2:Minimum energy performanceposted by James Cai on
Warehouse ventilation filtration system
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Gabriela Mena on
I am working on a warehouse project that has supply fans (wall mounted) to ventilate the space, we are pursuing the Enhanced IAQ credit <<Interior Cross Contamination Prevention>>, this
Food Service Equipment
CI-v4 EAc5:Enhanced refrigerant managementposted by ESD Engineer on
For a LEEDv4 CI project, does food service equipment such as ice cube machines, ice machines, and chiller freezers need to be documented?
Fully Unconditioned Cold Dark Shell Envelope Requirements
CS-v4 EAp2:Minimum energy performanceposted by elvin ruya on
Hi,