Forum quick links
Points for not having Cooling Tower - System 7 - is it possible?
CS-v4 WEc3:Cooling tower water useposted by Konstantina Kalliakoudi on
Hello to all,
I have project CS which is nonresidential more than 5 Floors ( System 7 of ASHRAE 90.1- appendix G) and there will be NO cooling tower installed.
Door operation infiltration
CS-v4 EAp2:Minimum energy performanceposted by Julio Fernandez Amodia on
Dear all,
Glare control devices for residential projects
NC-v4 EQc7:Daylightposted by Sana Hafsa on
I have a residential project aiming for certification under LEED v4 NC BD+C (the buildings are over 8 floors).
DES Systems
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
Dear LEEDUser friends,
Entire floor area counts if at least 75% has a view?
NC-v4 EQc8:Quality viewsposted by Martha Norbeck on
The v2009 view credit included this provision: "For private offices, the entire floor area of the office may be counted if 75% or more of the area has a direct line of sight to perimeter vision gla
Relevance in Scandinavian climate
NC-v4 SSc5:Heat island reductionposted by Martin Maribo on
I am living in a country where the highest energy costs are heating, not cooling, our buildings.
Ready Mix Concrete
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Mu'ath Ad on
Is there/ what papers/certification is needed to submit by the RMC (Ready Mix Concrete) Supplier regarding LEED?
District Energy Systems
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
Dear LEED User friend,
District Energy Systems
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
Dear LEED User friend,
District Energy Systems
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
Dear LEED User friend,