Forum quick links
Unusual circumstances
Pilot-Credits PC14:Walkable Streetsposted by Trinidee Shelton on
We are considering using this pilot credit in order to demonstrate siting a project in order to take advantage of the walkability of the project itself and put less emphasis on the parking lots des
SSpc14 Walkable Project Sites - navigating process
Pilot-Credits PC14:Walkable Streetsposted by Margaret Montgomery on
Wow. The credit makes some sense, but the process is definitely a challenge. I just spent 20 minutes trying to find the survey to complete it.
Campus
Pilot-Credits PC14:Walkable Streetsposted by Megan Recher on
We are applying the pilot credit in a campus setting, where the primary façade fronts a pedestrian plaza, as opposed to street.
On-Street Parking
Pilot-Credits PC14:Walkable Streetsposted by Carly Ruggieri on
Can projects use on-street parking that has time limitations (e.g. Parking is prohibited from 8am-6pm on Weekdays)?
Street trees
Pilot-Credits PC14:Walkable Streetsposted by Roland Le Roux on
Some of our buildings are located in the historical districts of Paris (without necessarily being historical buildings themselves).
Zero lot project
Pilot-Credits PC14:Walkable Streetsposted by Belén Valladares López on
We are working in a zero lot line project. It's possible to consider this credit as there is no interior siewalks? Thanks
Garage/service openings with driveway crossings at sidewalk
Pilot-Credits PC14:Walkable Streetsposted by Qiongwen Kong on
This is in regards to the requirements 6 and 7. 6 - No more than 20% of the street frontage includes garage or service bay openings. Alley access is used instead, if available.
Main Entry facing a Plaza
Pilot-Credits PC14:Walkable Streetsposted by Roshini Das on
Our project is a dormitory for 1-8 grade kids located in a campus.
Access to Public Spaces
Pilot-Credits PC14:Walkable Streetsposted by Jennifer Preston on
Is there a requirement or guideline as to how far from the project site the public spaces/squares/plazas need to be?
Double sidewalk and bike path
Pilot-Credits PC14:Walkable Streetsposted by Agnes Vorbrodt on
I'm wondering how to treat the