CI-v4 EAp2:Minimum energy performance
posted by  Omar Elrawy  on 

I'm modeling a fit out space in which the data for the base building envelope (U values and SHGC) are not available, need to know if I can use the baseline envelope data in my proposed model?

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 6, 2020, 4:16 pm

General Modeling Guidance

CI-v4 EAp2:Minimum energy performance
posted by  RDK E&S  on 

Hi, 

We are working on a project that includes 13 floors that spans a 35 story commerical building. I have a few general questions about process: 

1
Wed May 6, 2020, 8:08 pm

Energy Star Target Finder Outside US?

CI-v4 EAp2:Minimum energy performance
posted by  Annabelle Cruz  on 

We are currently trying to get the certification for one of our projects here in Dubai, UAE which consists of a small office in a 5-storey building under LEED CI v4.

6
Tue Mar 24, 2020, 2:58 pm
1
Mon Feb 24, 2020, 3:47 pm
1
Wed Feb 5, 2020, 7:52 pm

HVAC system selection for unfinished spaces.

CI-v4 EAp2:Minimum energy performance
posted by  Graham Langton  on 

I have a a single story building that requires a Baseline system 6 (per table G3.1.1A), which according to G3.1.1 is modeled on a floor by floor basis - So I have 1 system.

3
Thu Jan 23, 2020, 6:06 pm

Existing Fenestration in baseline model for CI projects

CI-v4 EAp2:Minimum energy performance
posted by  Aravindraj RB  on 

Project type       : LEED ID+C (CI) Version 4

Query                : EA Pr. Minimum Energy Performance (Table G 3.1.5)

8
Default Avatar
Director of Sustainability
Ventrop Engineering Consulting Group PLLC
LEEDuser Premium Member
2 thumbs up
Wed Jan 22, 2020, 4:15 pm

Receptacle Control Information documentation for ASHRAE 90.1-2010

CI-v4 EAp2:Minimum energy performance
posted by  Brightworks Sustainability  on 

My project team received this comment and we are not sure how to address it. We have submitted a number of LEED-CI v4 projects and have never received this comment.

2
Sustainability Enabler
Eskew+Dumez+Ripple
LEEDuser Basic Member
20 thumbs up
Sun Dec 22, 2019, 10:17 pm

Can consider the air cooled chiller yard as central plant

CI-v4 EAp2:Minimum energy performance
posted by  SSN Energy Model  on 

Hi to all,

Greetings!

I am doing Energy Model as per design documents of office space which has target for LEED ID+C Gold v4.

1
Fri Oct 11, 2019, 1:50 pm
7
Sustainability Enabler
Eskew+Dumez+Ripple
LEEDuser Basic Member
20 thumbs up
Thu Oct 3, 2019, 12:49 am