Tenant doesn't install water fixtures - can automatically get 1 point for Option 1 - water analysis?
CI-v4 IPc1:Integrative processposted by Michael on
Hi, My project is interior retail, and they don't install any sanitaryware fixtures in tenant scope.
LEED Interpretation 10471
CI-v4 IPc1:Integrative processposted by Dave Hubka on
I just learned from a LEED review report that owner's renovating their own space must "identify one or more viable locations, undertake the comparison outlined in Site Selection requirements, and c
Denied by not doing " use of ongoing feedback mechanisms ". How can we appeal?
CI-v4 IPc1:Integrative processposted by Jorng-ren Chern on
Our LEED ID+C V4 IP credit was denied and the following review comment was provided:
Site Selection and Energy-Related Systems
Requirements for "Ongoing Feedback Mechanism"?
CI-v4 IPc1:Integrative processposted by Renee Shirey on
The requirement of "Briefly describe the planned method for gathering feedback on occupant satisfaction. Include information on sample sizes,
LEED CI v4 in a CS V2009
CI-v4 IPc1:Integrative processposted by Gabriela Mena on
Hi, We are designing a Commercial Interior v4 Space in a building that is already certified under CS v2009 with a Platinum level.
Simple Box energy model - required?
CI-v4 IPc1:Integrative processposted by Katarzyna Toczynska on
Dear all,
Simple Box energy model requirements
CI-v4 IPc1:Integrative processposted by Deborah Stadler on
What exactly is required to be submitted for documentation for the simple box model? We see the worksheet and narrative listed as required documentation for this credit. There is so muc
Not eligible if no non-potable water?
CI-v4 IPc1:Integrative processposted by emily reese moody on
It appears that a project may not be eligible for the 1 point associated with the Water Related System if their building(s) do not offer non-potable water sources. Is this correct?
partial credit?
CI-v4 IPc1:Integrative processposted by Dana Piper on
If the tenant is remodeling existing space or the move location is predetermined, is it possible to get 1 of 2 points if we start in pre-design and look at energy and plumbing systems?