Option 3 without tenant meters
EBOM-v4 EAc4:Optimize energy performanceposted by Omar Elrawy on
Hi All,
We are conducting feasibility study on an existing building in which we are changing chillers. And we are planning to comply under Option 3: Historical Data
Energy metered
EBOM-v4 EAc4:Optimize energy performanceposted by FRANCISCO JAVIER JIMENEZ MARQUEZ on
Hello,
Pharmaceutic Industry Aplication
EBOM-v4 EAc4:Optimize energy performanceposted by Gustavo Fialho Pinto on
According to (Capparella, 2013) the average values of pharmaceutical industry energy spending can be estimated at 4391 kWh / m² per year, and in his article he justifies how the determination of
Lab Ventillation Requirement
EBOM-v4 EAc4:Optimize energy performanceposted by Greg DiDomenico on
Hello All,
Group project
EBOM-v4 EAc4:Optimize energy performanceposted by Jourdan Younis on
We have registered 2 buildings as a group project, both buildings are metered and we have the data for both buildings.
Metered energy data
EBOM-v4 EAc4:Optimize energy performanceposted by LEED Pro Consultant on
We are in the process of certifying a LEED EBOM project. We have an inquiry for the required 12 months of continuous energy data.