Forum quick links
Daylighting for Light Industrial
CS-v4 EQc4:Daylightposted by Troy Glasner on
Hi, I am helping a client, they have a light industrial project that has a workshop in the back area and an office mezzanine.
Tenants installing glare control devices
CS-v4 EQc4:Daylightposted by Ricardo Sá on
According to Reference Guide, manual or automatic (with manual override) glare-control devices shall be provided for all regularly occupied spaces in order to comply with credit requirements.
Daylight monthly measurement
CS-v4 EQc4:Daylightposted by Vassil Vassilev on
Greetings,
There is a question related to Option 3 of EQc4 – Daylight.
It has been mentioned (page 725), quoting: “Take one measurement in any regularly occupied month…”.
Number of Lux Measurements in a High Rise Office Tower
CS-v4 EQc4:Daylightposted by Christine Recke on
In a Core and Shell project Office Tower that is over 50 stories, the rule is still measure all regularly occupied spaces in the building?
Representative Measurements
CS-v4 EQc4:Daylightposted by Summer Minchew on
Similar to how we would address views in a core and shell project, can Option 3 measurements be conducted based on a representative floor plan(s) or would measurements need to be conducted for the
Revit Insight software for daylight stimulation
CS-v4 EQc4:Daylightposted by Shefali Shah on
We are using Revit Insight software for daylight stimulation for (V4.1) option 1
Exclusions from Regularly Occupied Spaces for Lab Spaces
CS-v4 EQc4:Daylightposted by Jordan Daniels on
I was wondering if someone can help here. Working on a v4 C&S 5 story building. Some of the tenant space on each floor is laboratory space (40% approximately of each floor).
Excluding reuglarly occupied areas
CS-v4 EQc4:Daylightposted by Jens Apel on
I know there is a must in the rating system variations; but is there any chance in C&S to exclude areas that are defined as regularly occupied?
Sefaira Software for Daylight calculation - sDA and ASE
CS-v4 EQc4:Daylightposted by Nuttanee Vongveeranonchai on
Dear All,
I found that Sefaira has calculated sDA and ASE which are required for LEED v4 Daylight compliance. Can I use this result for the submission?
New FAQ added on using Revit
CS-v4 EQc4:Daylightposted by Paula Melton on
We've added a new Frequently Asked Question on this credit: Can I use Revit to document this credit?