Reporting Renewable Energy Savings in Energy Model vs. Renewable Energy Section (LEED v4 energy update)

NC-v4 EAc5:Renewable energy production
posted by  Anurag Ghosh  on 

Hi all,

I’m working on a LEED v4 energy update project utilizing multiple renewable energy systems, such as:

  • Solar PV (electricity),

1
Tue May 6, 2025, 6:20 pm

Can a solar water heating system be considered a renewable energy system?

NC-v4 EAc5:Renewable energy production
posted by  zz kelvin  on 

Can a solar water heating system be considered a renewable energy system? Does it help with this credit? thanks.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jul 29, 2024, 8:08 am

Wind PPA OR PV garden question

NC-v4 EAc5:Renewable energy production
posted by  Kyu-min Lee  on 

Hello,LEEDuser!!!!

My project is planning to contract at least 10year more than 10 Gwh.(not confirmed about wind or PV but the amount is fixed, located in same utility service area)

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Apr 15, 2024, 8:28 pm

Existing PV on previously certified project

NC-v4 EAc5:Renewable energy production
posted by  Yu Zhang  on 

I have a project that is a new building located on a previous certified LEED project with PV production.  The previous project had >90% offset by energy use and >100% offset by cost from

10
Wed Mar 6, 2024, 5:20 pm

Solar powered parking lot lights

NC-v4 EAc5:Renewable energy production
posted by  Jason Garvens  on 

Would dedicated solar powered parking lot lights help contribute toward obtaining x% of the buildings annual energy cost covered by renewable energy?

3
Default Avatar
LEEDuser Basic Member
3 thumbs up
Mon Mar 27, 2023, 5:52 pm

Production of renewable energy but sent to the grid

NC-v4 EAc5:Renewable energy production
posted by  Borja Sánchez  on 

Hi, I´d like to know what happens when the project owner also owns a PV systems on the project boundary but it´s not been used on the same building and sends all the production to the grid (selling

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 21, 2022, 12:25 am

Is proof of 3rd party Cx of Renewable Energy installations required?

NC-v4 EAc5:Renewable energy production
posted by  Joyce Kelly  on 

Proof of 3rd party Cx was requested by a Reviewer in a 2009 project. I'm no longer seeing this mentioned in v4... or is it implicit?

5
Default Avatar
Sustainability Consultant
The Green Engineer
LEEDuser Premium Member
7 thumbs up
Fri Feb 11, 2022, 7:52 pm

Low-impact hydroelectricity

NC-v4 EAc5:Renewable energy production
posted by  CT G  on 

We're working on a project that is off-grid with energy generated via hydroelectricity, that supplies energy only to the building.

3
Default Avatar
LEEDuser Premium Member
19 thumbs up
Thu Jul 8, 2021, 3:53 pm

Campus with shared PV plant

NC-v4 EAc5:Renewable energy production
posted by  Ricardo Sá  on 

Dear All,

 

We’re currently working on a LEED certification of a project with the following characteristics:

3
Tue Jun 8, 2021, 5:13 pm

Is PV Watts acceptable documentation?

NC-v4 EAc5:Renewable energy production
posted by  Erin Holdenried  on 

Is PV Watts calculator acceptable documentation for this credit?  The specific PV panels for our project will not be selected until construction, so we won't have a more specific calculation o

1
Tue May 18, 2021, 3:29 pm