Forum quick links
Account for local and utility central energy plants
NC-v4 EAp2:Minimum energy performanceposted by S. Sachs on
We are building an addition to an existing building that has a central plant that is outside of our LEED boundary. However, we also have a contract to improve the performance of the central plant.
DES Option 1 - Baseline System
NC-v4 EAp2:Minimum energy performanceposted by Jay patel on
I am modeling a new building(Laboratory/office) on a university campus following LEED v4 Option 1, Whole Building Energy Simulation. New Building is 3 story and 69,500 sq.ft .
District Energy Treatment in LEEDv4
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Is there any new guidance or published changes for modeling district energy loops in LEED v4?
Thank you USGBC for Energy Performance Calculator
NC-v4 EAp2:Minimum energy performanceposted by Jean Marais on
Thank you USGBC for Energy Performance Calculator. I remember the days before...where you had to make your own more or less whilst fumbling through projects.
Data Center Baseline HVAC System
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Hi Markus, Thanks for your reply. I've been trying to undestand the explanation of 90.1-2013 User's Manual, page G-35.
Industrial facility in ASHRAE 90.1 2010
NC-v4 EAp2:Minimum energy performanceposted by Richard Bartlett on
We are designing a research and development facility for an equipment manufacturer and trying to pursue LEED certification for the facility.
Elementary School
NC-v4 EAp2:Minimum energy performanceposted by K Nakamura on
Is there any special considerations for a project registered (v2.2) and designed 10 years ago is now being constructed. V2.2 and v2009 have expired so we need to register it for v4.
Third Party Review v4?
NC-v4 EAp2:Minimum energy performanceposted by SBS Department on
Does anyone know if either prereq EA - Minimum Energy Performance, or the Optimize Energy Performance credit need a third party review as it did under the CaGBC's LEED 2009?
Manufacturing process
NC-v4 EAp2:Minimum energy performanceposted by ignacio furniés on
My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility.
Sea Water Cooled Chiller Modeling
NC-v4 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.