Forum quick links
System 2 as the baseline system for the whole project
NC-v4 EAp2:Minimum energy performanceposted by Amal Venugopal on
We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. Greetings!...
Virtual DES Energy Rates
NC-v4 EAp2:Minimum energy performanceposted by Todd Tewksbury on
When modeling district cooling and heating systems using Option 1, Path 1: ASHRAE 90.1-2010 Appendix G, the LEED Reference Guide instructs the following: "If tariffs or rates are not available from
Clean Room HVAC as process load?
NC-v4 EAp2:Minimum energy performanceposted by Maria Papiez on
We are working on a project that includes spaces used to manufacture healthcare instrumentation in a clean room environment. The client’s Engineering Standards as well as ISO 14644-1 Standard
Voltage Drop // mandatory provisions ASHRAE 90.1 - 2010 - ADDENDA 10218
NC-v4 EAp2:Minimum energy performanceposted by Sara BENLOUBA on
Hello everybody,
We are working on a project under LEED V4 certification.
Partial use of Plant equipment for LEED certification
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
Proposed interior lighting power allowance
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hello,
Clean room ventilation and systems - Process Load
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hi all,
"external" process energy for airports - jet bridges, ground power units, andpreconditioned air units
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Hello,
WWR allowances
NC-v4 EAp2:Minimum energy performanceposted by Julio Fernandez Amodia on
Air Curtains in ASHRAE/IES Standard 90.1-2019
NC-v4 EAp2:Minimum energy performanceposted by Nima Soltani on
Recent ASHRAE/IES Standard 90.1-2019 Updates include the possibility of installing an air curtain system instead of installing a Vestibule / Revolving Door Entrance.