Forum quick links
Different lighting levels on daylight sensor or program
NC-v4 SSc6:Light pollution reductionposted by Marilou Communeau on
Hello,
We are considering having the exterior lighting on daylight sensor and also on a management program.
Occasionnal Uplight Lighting (for special events)
NC-v4 SSc6:Light pollution reductionposted by Marilou Communeau on
Hello,
The project I am working on is in zone LZ-1 (occupied part of a park).
Is lighting inside a facade or double skin considered as exterior lighting ?
NC-v4 SSc6:Light pollution reductionposted by Marilou Communeau on
Is lighting inside a facade or double skin considered as exterior lighting ?
Uplight
NC-v4 SSc6:Light pollution reductionposted by Carlie Bullock-Jones on
We have fixtures that are located in a covered area (under a plaza) which exceed the allowable uplight rating.
Glare requirement exemption
NC-v4 SSc6:Light pollution reductionposted by David Makee on
I saw a similar question regarding uplight, but is it possible for a building-mounted light fixture to be excluded from the glare requirements if it is shielded from the lighting boundary by anothe
Walkway versus public street
NC-v4 SSc6:Light pollution reductionposted by Jens Apel on
This may be an academic question but I am unsure on the wording. The modification of the lighting boundary depends on adjacency to a walkway or a public street.
n/a
NC-v4 SSc6:Light pollution reductionposted by Heather Holdridge on
If I understand the LEED requirements for exterior lighting, we will be following the BUG guidelines for all lighting that will remain on from sunset to sunrise.
Lighting boundary SSc6 in new
NC-v4 SSc6:Light pollution reductionposted by Ilse Dijkstra-Nugteren on
In LEED v2009 there is mentioned the following about the lighting boundary: illuminance generated from a single luminaire placed at the intersection of a private vehicular driveway and public roadw
Existing Lighting Included?
NC-v4 SSc6:Light pollution reductionposted by Brightworks Sustainability on
Is existing lighting required to be included in the BUG rating prescriptive method? We have a project where only some site lighting is being upgraded; the rest will remain.