Post a question or comment
Credit Filters
Light pollution reduction
Filter by location
Forum
Topic
Replies
Recent

Ux parameter in BUG rating

NC-v4 SSc6:Light pollution reduction
posted by  Zuzanna Targosz  on 

Have you ever had Ux parameter in BUG rating in photometric file for a light fixture? For example B2 - Ux - G2. If yes, how did you proceed to show complaince? 

1
Wed Sep 22, 2021, 12:47 pm
2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Sep 3, 2021, 7:47 pm

Lighting Zones for BUG method of compliance

NC-v4 SSc6:Light pollution reduction
posted by  Tricia Loe  on 

Our project has two buildings on a corporate campus. We plan to use the “BUG” method to show compliance with this credit.

1
Wed Aug 18, 2021, 1:33 am

Marquee sign to be provided at a later time

NC-v4 SSc6:Light pollution reduction
posted by  Tacy Austin  on 

The marquee sign is shown on our site plans but the intention is to install at a later date.  To receive this credit, what is the best way to document this?

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Aug 16, 2021, 12:58 am

Light Trespass - Consideration for presence detection

NC-v4 SSc6:Light pollution reduction
posted by  James Cox  on 

Hi All,

We are currently struggling to achieve the light trespass section of this credit on one section of the project. 

1
Tue Jul 6, 2021, 9:24 pm

Exemptions

NC-v4 SSc6:Light pollution reduction
posted by  Heather Holdridge  on 

I am working on a project with exterior fixtures that are not illuminating a building facade but more artwork/ sculptural landscape screenwork.

2
Default Avatar
Soden Sustainability Consulting
LEEDuser Premium Member
0 thumbs up
Tue Jun 1, 2021, 5:54 pm

No credit uploads available for credit `Light Pollution Reduction` within project

NC-v4 SSc6:Light pollution reduction
posted by  Maddie Spinski  on 

Has anyone gotten this message when they went to the Uploads tab and was unable to upload any documents to LEEDonline?

 

2
President
Doo Consulting LLC
LEEDuser Basic Member
136 thumbs up
Mon May 24, 2021, 3:50 pm

LZ3- Glare exemption

NC-v4 SSc6:Light pollution reduction
posted by  Madhura Dhayagude  on 

Hello, 

I have a question regarding glare ratings for open air showrooms. 

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Apr 19, 2021, 3:58 pm

Photometric Calculations- Perimeter Wall

NC-v4 SSc6:Light pollution reduction
posted by  Zeynep Cakir  on 

Our project is located in LZ2 light zone. Bollard light fixtures are used for landscape and walkway lighting.

1
Wed Apr 14, 2021, 4:21 pm

Partial "Lumens above Horizontal" calculation

NC-v4 SSc6:Light pollution reduction
posted by  Jack Ma  on 

Anyone have experience documenting an uplight light fixture with a permanent structure above for “partial lumens above horizontal” calculation, please let me know

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Feb 18, 2021, 8:54 pm